My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
B
>
1603
>
3500 - Local Oversight Program
>
PR0543430
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2019 11:08:01 AM
Creation date
2/5/2019 9:38:44 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0543430
PE
3528
FACILITY_ID
FA0009377
FACILITY_NAME
CAL TRANS MAINT SHOP 10
STREET_NUMBER
1603
Direction
S
STREET_NAME
B
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16918002
CURRENT_STATUS
02
SITE_LOCATION
1603 S B ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
219
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Field staff must review job-specific work plan and coordinate with project manager to verify that all up-front logistics are completed prior to starting work including, but <br /> not limited to, permitting, access agreements, and notification to required contacts(e.g. site managers, inspectors, clients, subcontractors, etc.). A tailgate safety <br /> meeting must be performed and documented at the beginning of each workday. Plan, Prevent, Execute (PPE)/Safe Performance Self Assessment(SPSA) <br /> procedures must be used throughout the project. Weather conditions(heat, cold, rain, lightning) must also be considered. Each employee is empowered, expected, <br /> and has the responsibility to stop the work performed by him/herself or another co-worker if the working conditions or behaviors are considered unsafe.All employees <br /> should act eroactively to identify and mitigate hazards to the safest extent of their ability. <br /> Set up exclusion zone(s) Wear reflective vest for traffic, Struck by vehicle during • Implement exclusion ions set-up <br /> and workstations (drilling steel toed and shank shoes, set up. Slip, trip and fall StanteclContractor <br /> and logging/sample long sleeve shirt, hardhat, hazards. • It is the responsibility of the SHSO to annotate the Site Plan with <br /> collection). safety glasses with side the Exclusion Zone set up.-Stantec. <br /> shields, and leather gloves as • Set up workstations with clear walking paths to and from rig. Use <br /> necessary. caution tape and or construction fence and delineators <br /> StanteclContractor. W <br /> Coordinate and assist with Wear reflective vest for traffic, Vehicle accident during rig • All staff should know where the kill switch is for the drilling rig- <br /> set up of equipment.andlor steel toed and shank shoes, movement. Damage StanteclContractor. <br /> subcontractor service long sleeve shirt, hardhat, caused by rig while • Mast should be in the down position before moving the rig <br /> being used for utility safety glasses with side accessing set-up location. StanteclContractor. <br /> clearance in subsurface shields, and leather gloves as Contact with overhead • Verify clear pathway to drilling locationand clearance for raising <br /> i6estigation area.Take necessary. installations. Soft terrain. ; mast-StanteclContractor. - <br /> charge of site activities and Rig movement. • Provide as-needed hand signals and guidance to driver to place rig <br /> manage site work and/or <br /> -StanteclContractor <br /> subcontractors •Visuallyinspect drill rig (fire extinguisher on board, no oil or other <br /> fluid leaks, cabling and associated equipment in good condition; <br /> pressurized hoses secured with whip-checks or adequate substitute, <br /> jacks in good condition?) - <br /> StanteclContractor. <br /> • Provide as-needed hand signals and guidance to driver to place <br /> E . AET-StanteclContractor. <br /> • If necessary, use wooden blocks under jacks to spread load - <br /> Contractor. <br /> • Chock wheels-Contractor. <br /> k t <br /> STANTEC Consulting Corporation <br /> a, r 13-22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.