Laserfiche WebLink
r.. r.771"T r_1171 r-'-71 C` Imo" �.. r�"" 1_-'3 r7l"_ r7_7 r r_--, U-7 r' , �- <br /> Field staff must review job-specific work plan and coordinate with project manager to verify that all up-front logistics are completed prior to starting work including, but <br /> not limited to, permitting, access agreements, and notification to required contacts (e.g. site managers, inspectors, clients, subcontractors, etc.). A tailgate safety <br /> meeting must be performed and documented at the beginning of each workday. Plan, Prevent, Execute (PPE)/Safe Performance Self Assessment (SPSA) <br /> procedures must be used throughout the project. Weather conditions (heat, cold, rain, lightning) must also be considered. Each employee is empowered, expected, <br /> and has the responsibility to stop the work performed by him/herself or another co-worker if the working conditions or behaviors are considered unsafe. All employees <br /> should act proactivel to identify and miti ate hazards to the safest extent of their abili <br /> Commence drilling Steel toed and shank shoes, Cross-contamination from • Decontaminate sampling equipment after collecting a sample and <br /> operation. long sleeve shirt, hardhat, previous hole. Back strain, decontaminate drilling equipment after each borehole <br /> safety glasses with side heat or cold, eye injury, Stantec/Contractor. <br /> shields, hearing protection, noise, exposure to • Use proper lifting techniques available <br /> reflective safety vest, and chemical hazards, hitting Stantec/Contractor <br /> leather gloves for the non- an underground utility, • Conduct air monitoring as outlined in Section 12 <br /> chemical aspects of work as slips, trips and falls, Stantec. <br /> necessary.Wear appropriate equipment failure. • Have appropriate respirator with combination organic vapor/P-100 <br /> air purifying respirator with cartridges within 3-5 feet of work area, readily available <br /> combination organic vapor/P- Stantec/Contractor. <br /> 100 cartridges if needed.Wear • Monitor drilling progress Stantec. <br /> chemical resistant gloves if • Kee Work area clear of slip/trip/fall hazards <br /> needed. p <br /> Stantec/Contractor <br /> • Perform periodic visual inspections of drill rig <br /> Stantec/Contractor. <br /> • DO NOT USE J HOOKS OF ANY TYPE FOR LIFTING OF <br /> MATERIALS OR EQUIPMENT <br /> Stantec/Contractor. <br /> • DO NOT MOVE DRILL RIG WITH THE MAST RAISED <br /> Stantec/Contractor <br /> If drilling does,.not.proceed....:', ..Steel -and-shank-shoes,... __.,- _.,Tripping,.,wretched.ankles, . . _•.-Appropriate-methods.of.-.covering.a=cleared-bore;hole can-include- <br /> immediately, cover cleared long sleeve shirt, hardhat, broken limbs, foreign 1) steel drive plates affixed to surrounding pavement capable of <br /> bore holes prior to leaving safety glasses with side objects or substances enduring site traffic without dislocating 2)A sealed 55-gallon steel <br /> = _site, shields-. hearing-protection,,- Introduced into.cleared dram-with-some-soil-or-water-in-it-to-add-weight placed over"the'bore <br /> reflective safety vest, and bore holes hole and surrounded by delineator cones or horses (flashers <br /> leather gloves for the non- optional)or 3) (preferred method) Backfill open, cleared borehole <br /> chemical aspects of work as with clean sand to within 2-inches of surface grade and place <br /> necessary. Wear appropriate compacted asphalt cold-patch matched to surface grade <br /> air purifying respirator with Stantec/Contractor <br /> combination organic vapor/P- <br /> 100 cartridges if needed.Wear <br /> chemical resistant gloves if <br /> needed <br /> STANTEC Consulting corporation <br /> 13-23 <br />