<br /> Field staff must review job-specific work plan and coordinate with project manager to verify that all up-front logistics are completed prior to starting work including, but
<br /> not limited to, permitting, access agreements, and notification to required contacts (e.g. site managers, inspectors, clients, subcontractors, etc.). A tailgate safety
<br /> meeting must be performed and documented at the beginning of each workday. Plan, Prevent, Execute (PPE)/Safe Performance Self Assessment (SPSA)
<br /> procedures must be used throughout the project. Weather conditions (heat, cold, rain, lightning) must also be considered. Each employee is empowered, expected,
<br /> and has the responsibility to stop the work performed by him/herself or another co-worker if the working conditions or behaviors are considered unsafe. All employees
<br /> should act proactivel to identify and miti ate hazards to the safest extent of their abili
<br /> Commence drilling Steel toed and shank shoes, Cross-contamination from • Decontaminate sampling equipment after collecting a sample and
<br /> operation. long sleeve shirt, hardhat, previous hole. Back strain, decontaminate drilling equipment after each borehole
<br /> safety glasses with side heat or cold, eye injury, Stantec/Contractor.
<br /> shields, hearing protection, noise, exposure to • Use proper lifting techniques available
<br /> reflective safety vest, and chemical hazards, hitting Stantec/Contractor
<br /> leather gloves for the non- an underground utility, • Conduct air monitoring as outlined in Section 12
<br /> chemical aspects of work as slips, trips and falls, Stantec.
<br /> necessary.Wear appropriate equipment failure. • Have appropriate respirator with combination organic vapor/P-100
<br /> air purifying respirator with cartridges within 3-5 feet of work area, readily available
<br /> combination organic vapor/P- Stantec/Contractor.
<br /> 100 cartridges if needed.Wear • Monitor drilling progress Stantec.
<br /> chemical resistant gloves if • Kee Work area clear of slip/trip/fall hazards
<br /> needed. p
<br /> Stantec/Contractor
<br /> • Perform periodic visual inspections of drill rig
<br /> Stantec/Contractor.
<br /> • DO NOT USE J HOOKS OF ANY TYPE FOR LIFTING OF
<br /> MATERIALS OR EQUIPMENT
<br /> Stantec/Contractor.
<br /> • DO NOT MOVE DRILL RIG WITH THE MAST RAISED
<br /> Stantec/Contractor
<br /> If drilling does,.not.proceed....:', ..Steel -and-shank-shoes,... __.,- _.,Tripping,.,wretched.ankles, . . _•.-Appropriate-methods.of.-.covering.a=cleared-bore;hole can-include-
<br /> immediately, cover cleared long sleeve shirt, hardhat, broken limbs, foreign 1) steel drive plates affixed to surrounding pavement capable of
<br /> bore holes prior to leaving safety glasses with side objects or substances enduring site traffic without dislocating 2)A sealed 55-gallon steel
<br /> = _site, shields-. hearing-protection,,- Introduced into.cleared dram-with-some-soil-or-water-in-it-to-add-weight placed over"the'bore
<br /> reflective safety vest, and bore holes hole and surrounded by delineator cones or horses (flashers
<br /> leather gloves for the non- optional)or 3) (preferred method) Backfill open, cleared borehole
<br /> chemical aspects of work as with clean sand to within 2-inches of surface grade and place
<br /> necessary. Wear appropriate compacted asphalt cold-patch matched to surface grade
<br /> air purifying respirator with Stantec/Contractor
<br /> combination organic vapor/P-
<br /> 100 cartridges if needed.Wear
<br /> chemical resistant gloves if
<br /> needed
<br /> STANTEC Consulting corporation
<br /> 13-23