Field staff must review job-specific work plan and coordinate with project manager to verify that all up-front logistics are completed prior to starting work including, but <br /> not limited to, permitting, access agreements, and notification to required contacts (e.g. site managers, inspectors, clients, subcontractors, etc.). A tailgate safety <br /> meeting must be performed and documented at the beginning of each workday. Plan, Prevent, Execute (PPE)/Safe Performance Self Assessment(SPSA) <br /> procedures must be used throughout the project. Weather conditions(heat, cold, rain, lightning) must also be considered. Each employee is empowered, expected, <br /> and has the responsibility to stop the work performed by him/herself or another co-worker it the working conditions or behaviors are considered unsafe.All employees <br /> should act roactivel to identifV and mitigate hazards to the safest extent of their abili . <br /> RNMEN,MEMO 1 01111, i <br /> Set up exclusion zone(s) Wear reflective vest for traffic, Struck by vehicle during • Implement exclusion zone set-up. <br /> and workstations(drilling steel toed and shank shoes, set up. Slip, trip and fall Stantec/Contractor. <br /> and logging/sample hardhat, safety glasses with hazards. • It is the responsibility of the SHSO to annotate the Site Plan with <br /> collection). side shields, and leather gloves the Exclusion Zone set up. Stantec. <br /> as necessary. • Set up workstations with clear walking paths to and from rig. <br /> Stantec/Contractor. <br /> • Use safety tape, snow fence, and/or delineators. <br /> Stantec/Contractor. <br /> • If utilizing Visqueen, (sheet plastic), for sampling area, completely <br /> secure Visqueen to the pavement, dirt, etc with duct tape, <br /> delineators, etc Do not use objects that are hard to notice or could <br /> become a trip hazard themselves. Stantec/Contractor. <br /> Clear total depth of Don required PPE as Back strain, exposure to • Inform drillers that they may use a mallet to strike the auger bucket <br /> borehole (approximately appropriate for this step: steel chemical hazards, hitting to loosen/remove soil. However, one hand should be placed on the <br /> 5.5 feet) using a hand toed and shank shoes, hard an underground utility, connection point between the hand auger bucket and the auger rod <br /> auger hat, safety glasses with side repetitive motion. and the other hand should be holding the mallet. The hand auger <br /> shields, hearing protection, should be secured and stable before using a mallet to remove soil. <br /> reflective safety vest, and from the auger bucket Stantec/Contractor. <br /> leather gloves for the non- • Proceed cautiously and periodically stop to observe conditions in <br /> chemical aspects of work as the open hole. Use a high-beam flashlight or mirror to reflect sunlight <br /> necessary.Wear chemical ._ into_the_hole for.observations.. _-._-. _ <br /> reds an g oves unng h6il Trig Stantec/Contractor. <br /> of soil.Wear an air-purifying • Care should be exercised in identifying resistance to excavation or <br /> _. respirator with combination__ recalcitrant-objects-as-they-may-not-appear-identifiable-until`more- <br /> organic vap&/P-100 cartridges fully exposed (i.e. you might break a pipe in the process of clearing <br /> if necessary. the hole before you are aware it is a pipe. Go Slowly-Visually Check <br /> Frequently). Stantec/Contractor. <br /> • Use proper lifting techniques and tools. Stantec/Contractor. <br /> - • Complete the Pre-Drilling section of the Borehole Clearance <br /> Review form. Stantec. <br /> •Avoid twisting back during the operation; Decontaminate <br /> equipment after use. Decontamination will be accomplished by a <br /> Liquinox wash with tap water rinse followed by a de-ionized or <br /> distilled water rinse. Collect rinse water in 5 gallon buckets and <br /> transfer to 55-gallon drums and stage drums <br /> Stantec/Contractor. <br /> STANTEC Consulting Corporation <br /> 13-29 <br />