Laserfiche WebLink
5.0 CONTRACTOR EMERGENCY ACTION PLAN <br /> The SHSO will ensure that the Subcontractor/Contractor is capable of efficient evacuation/emergency response in the event of an <br /> emergency. Subcontractor/Contractor's employees will be trained by their employer in site-specific evacuation/emergency procedures, <br /> including alarm systems and evacuation plans and routes. <br /> The Subcontractor/Contractor shall instruct its employees that in the event of an emergency such as a fire, release, or accident involving <br /> injuries, they are required to dial 911, or (209) 937-7911 (Stockton Police Department). The reporting employee is to state the problem <br /> clearly and fully and remain on the line until dismissed by the operator. <br /> STANTEC staff and Subcontractor/Contractors working in an area where an emergency exists shall evacuate to a safe location, preferably <br /> upwind, away from the area and take attendance. The gathering location will be determined by the STANTEC SHSO upon arrival on <br /> site. It is the responsibility of the SHSO to annotate the Site Plan with the gathering location position and to disseminate that info <br /> to all site personnel during the Daily Production Safety Meeting and any other appropriate time after that. <br /> (If the emergency causes the route to a gate surrounding the site to be closed, the STANTEC staff and Subcontractor/Contractors shall <br /> move to an open area upwind of the hazard area, and remain there until instructed by emergency response personnel (i.e., police, fire, <br /> ambulance, paramedics, etc.) to do otherwise.) <br /> Subcontractor/Contractor has the responsibility to account for its own employees and to provide such information immediately to <br /> emergency response personnel upon request. <br /> STANTEC staff and Subcontractor/Contractor may not reenter the emergency site without specific approval from emergency response <br /> personnel. <br /> In the event of fire ignition in close proximity to STANTEC staff and Subcontractor/Contractor's employees, those persons shall evacuate <br /> the area and notify emergency personnel unless the fire is readily extinguished with portable dry chemical equipment on-hand. <br /> When in doubt, emergency response personnel shall be notified. <br /> STANTEC Consulting Corporation <br /> 5-1 <br />