My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
B
>
1604
>
3500 - Local Oversight Program
>
PR0543431
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2019 12:04:16 PM
Creation date
2/5/2019 11:49:15 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0543431
PE
3528
FACILITY_ID
FA0003683
FACILITY_NAME
Caltrans-Stockton
STREET_NUMBER
1604
Direction
S
STREET_NAME
B
STREET_TYPE
St
City
Stockton
Zip
95206
APN
171-090-08
CURRENT_STATUS
02
SITE_LOCATION
1604 S B St
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
172
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
P 1 <br /> 2.0 STANDARD OPERATING PROCEDURE <br /> 2.1 Initial Start-Up Procedures for SVETS <br /> As stated in the Introduction,the SVETS consists of mechanical equipment that has been specified to <br /> meet performance requirements established for remediation of hydrocarbon-impacted soil at the <br /> Facility. <br /> Start up Preparation: <br /> 1. Verify that the Main Electrical Supply to the oxidizer control panel is OFF. <br /> 2. Verify that the oxidizer main electrical disconnect (DSC-701)is in the OFF position. DSC-701 <br /> is located on the front on the control panel. <br /> 3. With the main electrical disconnect in the OFF position, set the drain pump Hand-Off-Auto <br /> (HOA) switch as follows.This switch can be found on the front of the control panel. <br /> Description Hoa Switch Position <br /> Drain Pump(P101) HS-801 OFF <br /> 4. The following table shows how the process vapor values should be set prior to starting the <br /> system. <br /> Description Valve Position <br /> Quench Valve V101 OPEN <br /> Sight Glass Manual Isolation Valve V102' OPEN <br /> Sight Glass Manual Isolation Valve V103 OPEN <br /> Sample Port Valve V104 CLOSED <br /> P101 Inlet Manual Isolation Valve V105 OPEN <br /> Gauge Cock Valve V106 OPEN <br /> P101 Check Valve V107 N/A <br /> P101 Discharge Manual Isolation Valve V108 OPEN <br /> Manual Dilution Air Valve V110 OPEN <br /> Gauge Cock Valve Vi l l OPEN <br /> Recirculation Valve V112 OPEN <br /> Gauge Cock Valve V113 OPEN <br /> Gauge Cock Valve V114 OPEN <br /> Gauge Cock Valve V115 OPEN <br /> Sample Port Valve V116 CLOSED <br /> N/A=not Applicable <br /> 5. In order to perform start up procedures,provide power to the oxidizer control panel. <br /> 6. Energize the control panel by setting the Disconnect switch (DSC-701) to the ON position. <br /> 7. Press and release the system START button on the front of the control panel. <br /> r .7a. . The extraction blower (BL 101) will start. <br /> D:\PMP\Stockton Yard PMP.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.