My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0012551
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2905
>
3500 - Local Oversight Program
>
PR0544110
>
ARCHIVED REPORTS XR0012551
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2019 5:08:17 PM
Creation date
2/6/2019 4:29:07 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012551
RECORD_ID
PR0544110
PE
3528
FACILITY_ID
FA0003712
FACILITY_NAME
CHEVRON STATION #94275*
STREET_NUMBER
2905
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09760004
CURRENT_STATUS
02
SITE_LOCATION
2905 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
669
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_MTi z <br /> a � <br /> x <br /> NNW <br /> 'I <br /> levelw, testing andlor sampling will be stopped and action taken according to the Health and <br /> Safety Plan. <br /> 2.5 BAT'S'PROBE COMPLETION <br /> BATT'probes and BAT' riser pipe will be completed flush with the ground surface. ' <br /> _. A cast-iron vault box assembly with a protective locking lid will be centered over the BAVm <br /> probe installation. The assembly will be centered over a concrete pad which is slightly <br /> larger than the vault box. The concrete pad slopes away from the vault box to avoid surface <br /> accumulation of water. Drain pipes and pea gravel may be placed in the box to allow for <br /> free drainage of surface water within the vault box. A minimum of 1-foot clearance will be <br /> -. maintained between the BAT'probe top and the bottom of the vault box. A locking <br /> protecdve cover will be placed over the BATT'probe cap. The BATT'probe number will <br /> be clearly marked on the vault box lid. Each completion will bear a metal probe <br /> identification tag attached to the vault box. <br /> B,%, ''probe completion diagrams showing probe construction details will be completed by <br /> the Earth Technology geologist/hydrogeologist who supervised the probe installation. The <br /> completion diagrams will be contained in the final report. <br /> 2.6 MEASUREMENT'OF POTENTIOMETRIC LEVELS <br /> Water levels will be measured in all monitoring wells. Measurements will be taken after <br /> wells have stabilized prior to any well purging activities. Measurements will be recorded as <br /> feet below the measuring point elevation (usua'ly top of casing) to the nearest 0.01 foot and <br /> _ recorded as mean sea level(MSI.). Groundwater contour maps will be developed based on <br /> water level elevations reported. <br /> r. <br /> 0:191503MOlk I23.FL 7 <br /> 4 : <br />
The URL can be used to link to this page
Your browser does not support the video tag.