My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2908
>
3500 - Local Oversight Program
>
PR0544111
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2019 12:29:29 PM
Creation date
2/7/2019 10:28:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0544111
PE
3528
FACILITY_ID
FA0003625
FACILITY_NAME
ARCO STATION #83560*
STREET_NUMBER
2908
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09763032
CURRENT_STATUS
02
SITE_LOCATION
2908 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
WNg
标签
EHD - Public
Jump to thumbnail
< previous set
next set >
该页面上没有批注。
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
551
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
report documents the limited extent of soil contamination at the site. <br /> The yearly groundwater sampling report, as required by PHS/EHD, is <br /> anticipated to be issued in September of this year. <br /> Fac. #2133, 2908 Benjamin Holt Drive, Stockton <br /> Offsite wells to be drilled once access has been granted and an additional <br /> monitoring well in the northwestern area of the site will be installed. A workplan <br /> to install vapor extraction wells to be submitted by May 31, 1993. <br /> ARCO has issued numerous reports on this site since the March '93 <br /> meeting, among them are: <br /> a) quarterly status reports dated 9/3/93,12/6/93, 3/10/94, & 6/21/94 <br /> which document that the groundwater recovery system has the <br /> groundwater plume under hydraulic control. <br /> b) Work Plan for Installation of various Wells dated 5/14/93. <br /> c) Soil Vapor Extraction, Air Sparge, & Groundwater Monitoring <br /> Well Installation report dated 3/10/94 which documents the installation of <br /> all wells discussed in the previous work plan. <br /> d) a Soil Vapor Extraction /Air Sparge System Installation <br /> Schedule dated 7/7/94 which documents the scheduling and permit status <br /> of the soon to be constructed remediation system. <br /> e) Work Plan for Installation of On-site Soil Vapor Extraction and <br /> Air Sparge Wells dated 7/18/94. <br /> An air emission treatment unit is currently stored at the site. All permits for <br /> construction of the remediation system have been obtained, the construction <br /> contractor has been selected and the construction of the remediation system is <br /> planned to begin shortly after the Labor day weekend. <br /> ARCO received a 3/24/94 letter from the PHS/EHD which stated that the <br /> PHS/EHD appreciated ARCO's efforts over the past year at this site. Clearly, <br /> ARCO is moving forward with remediation at this site while a neighboring oil <br /> company continues to only monitor their sizeable problem. <br /> Fac. #548, 1612 Hammer Lane, Stockton <br /> PHS/EHD requested continued definition of soil and groundwater <br /> contamination. Remediation will proceed when the contamination has been <br /> defined and equipment becomes available. <br /> ARCO has issued the following reports on this site since the March '93 <br /> meeting: a) quarterly status reports dated 6/21/93, 9/13/93, 11/8/93, & <br /> 6/15/94. <br /> b) a Work Plan for additional wells dated 10/14/93 <br /> c) a status report & Problem Assessment report dated <br /> 5/11/94. <br /> The PHS/EHD has requested additional information by 8/15/94 which <br /> ARCO will provide at that time. <br />
The URL can be used to link to this page
Your browser does not support the video tag.