Laserfiche WebLink
equipment. Three soil borings, B-1 through B-3, were drilled to approximately 25 feet <br /> below ground surface on the northern and downgradient boundary of the site,near the <br /> sidewalk on West Ben Holt Drive. Soil borings B-1 through B-3 were subsequently <br /> converted into monitor wells, MW-4 through MW-6, respectively. <br /> Laboratory analyses of soil and groundwater samples collected from this site during the two <br /> subsurface investigations indicate hydrocarbon impact to both soil and groundwater prima..rjy <br /> in the immediate vicinity of the pump island(borings Et-5,B-6 and monitor we!, MW-2)and <br /> ry the underground storage tanks (boring B-4). <br /> The underground storage tanks,pumps and product pipelines are-,cheduled to be removed. <br /> Because of the location and the levels of hydrocarbons present, the over-excavation and <br /> removal of soils containing hydrocarbons will probably remove the major source of <br /> hydrocarbons. These soils will be lying on and covered by visqueen pending analytical <br /> results. The soils will then be transported to the proper landfill. Groundwater remediation <br /> �l and/or additional soil remediation can then be evaluated. <br /> v <br />