My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0000627
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
3128
>
3500 - Local Oversight Program
>
PR0544112
>
ARCHIVED REPORTS XR0000627
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2020 7:51:35 AM
Creation date
2/7/2019 3:32:01 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0000627
RECORD_ID
PR0544112
PE
3528
FACILITY_ID
FA0005145
FACILITY_NAME
EXXON COMPANY USA
STREET_NUMBER
3128
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09523002
CURRENT_STATUS
02
SITE_LOCATION
3128 W BENJAMIN HOLT DR
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
equipment. Three soil borings, B-1 through B-3, were drilled to approximately 25 feet <br /> below ground surface on the northern and downgradient boundary of the site,near the <br /> sidewalk on West Ben Holt Drive. Soil borings B-1 through B-3 were subsequently <br /> converted into monitor wells, MW-4 through MW-6, respectively. <br /> Laboratory analyses of soil and groundwater samples collected from this site during the two <br /> subsurface investigations indicate hydrocarbon impact to both soil and groundwater prima..rjy <br /> in the immediate vicinity of the pump island(borings Et-5,B-6 and monitor we!, MW-2)and <br /> ry the underground storage tanks (boring B-4). <br /> The underground storage tanks,pumps and product pipelines are-,cheduled to be removed. <br /> Because of the location and the levels of hydrocarbons present, the over-excavation and <br /> removal of soils containing hydrocarbons will probably remove the major source of <br /> hydrocarbons. These soils will be lying on and covered by visqueen pending analytical <br /> results. The soils will then be transported to the proper landfill. Groundwater remediation <br /> �l and/or additional soil remediation can then be evaluated. <br /> v <br />
The URL can be used to link to this page
Your browser does not support the video tag.