My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0000935
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BROADWAY
>
1705
>
3500 - Local Oversight Program
>
PR0544127
>
ARCHIVED REPORTS XR0000935
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2019 4:41:54 PM
Creation date
2/8/2019 4:35:13 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0000935
RECORD_ID
PR0544127
PE
3528
FACILITY_ID
FA0009518
FACILITY_NAME
GEORGE F SCHULER INC
STREET_NUMBER
1705
Direction
N
STREET_NAME
BROADWAY
STREET_TYPE
AVE
City
STOCKTON
Zip
95205
APN
14315007
CURRENT_STATUS
02
SITE_LOCATION
1705 N BROADWAY AVE
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C f <br /> 3rd Quarter 1995,Quarterly Monitoring Report <br /> Former PureGro/Brea Facility <br /> 1905 North Broadway Avenue,Stockton,California <br /> Sierra-Pacific Project No.94-055.04 <br /> 2.0 METHODS <br /> 2.1 Water-Level Measurements <br /> The surveyed wells are fitted with permanent aluminum well caps,which screw onto machined <br /> brass collar fittings. Water level measurements were made using an electronic sounding device <br /> (Appendix A). All ground-water elevation measurements were made from the referenced well- <br /> head elevations, measured to the nearest 0.01 foot. Computed ground-water elevations are <br /> relative to mean sea level (Table 1). Three-point calculations were used to predict ground- <br /> water flow directions and potentiometric surface gradients (Table 2). The elevation of the MW- <br /> 11 well casing has not been determined by survey. Water level measurements made on <br /> September 18, 1995 were not used to determine the ground-water flow direction. The <br /> potentiometric surface map (Figure 3) was computer-generated using the Surfer computer <br /> � program. <br /> I 2 2. Water am oratorAnalysis <br /> ..,,.. er lin LabS ❑ � and v- . y <br /> f Each of the monitoring wells was purged prior to sampling to. assure the collection of <br /> l representative ground-water samples from the uppermost saturated zone. Water quality <br /> ` parameters (pH, electrical conductivity, and temperature) were measured as the wells were <br /> purged.. Each of the Broadway Avenue water samples was examined for odors, coloration, and <br /> turbidity.. Saihples were collected after the field parameters stabilized. Field notes are included <br /> in Appendix B. One to five wetted-well-volumes of water were withdrawn from each of the <br /> wells prior to collection of ground-water samples. Water levels recovered-rapidly from purging <br /> and sample collection. Water purged from the wells was placed in 55-gallon drums and staged <br />[ at the PureGro/Brea site for future disposal. <br /> Sierra-Paciflr Groundwater Consultants 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.