Laserfiche WebLink
r <br /> r <br /> To facilitate development of a portion of the Sunboro Development <br /> � - property, namely Parcel A identified above, Mr. David S. Ng, <br /> President, Sunboro Development Corporation, wrote a letter to <br /> i Mr. Mike McCluskey, Director of Public Works, dated June 7, 1988, <br /> i , (see Appendix A, page A-3) , outlining his plan for determining <br /> that parcel A is clean of contamination. Mr. Ng also sent a <br /> letter dated June 7, 1988 (see Appendix A, Page A-1) to Mr. Brian <br /> Foucht, City of Tracy proposing the following action: <br /> 1. The proposed subdivision site is composed of two legally separate <br /> parcels of land (Parcel A and Parcel B). <br /> 2. No petroleum hydrocarbon contamination has been found on or <br /> near Parcel A, and Parcel A is thought to be clean of such <br /> contamination. <br /> ,— 3. Sunboro Development proposes to have a series of soil borings <br /> drilled 25 feet deep along a line parallel with Byron Road's <br /> south boundary and 125 feet south of said Byron Road boundary. <br /> Eight (8) soil borings spaced approximately 200 feet apart will <br /> be bored, profiled and sampled for laboratory analysis. (Nine <br /> (9) soil borings were actually bored, and the samples analyzed. ) <br /> e 4. Once the above clean line is identified, the City of Tracy will <br /> allow processing of a tentative map for development of Parcel <br /> A. <br /> Mr. McCluskey's reply is found in Appendix A, page A--4. <br /> The above work has been completed and is the subject of this report. <br /> The following data is presented in the appendix of this report. <br /> 1. Map showing location of soil bora gs, Byron Road and boundaries <br /> of Parcels A and B. <br /> 2. Soil borings profile and logs. <br /> 3. Soil sample results. <br /> 4. Groundwater elevations. <br /> Following is the description of the field work performed. <br /> 1I-2 <br />