Laserfiche WebLink
City of Stockton Redevelopment Agency <br /> February 16, 2001 B34604.O1a <br /> B-7.1 Site Safety Meeting Agenda: Page B- 4 <br /> 1. Project: Gleason Park Pro Ame <br /> erties 300 California Street 323 <br /> California Street Stockton California Twinin Pro'ect No. B3460and 328 <br /> ' 2. Inclusive dates of field work, from: <br /> to_ <br /> ' 3. Personnel responsible for site safety: <br /> a. Project Manager: Jan Alfson <br /> b. Project Geologist: Katie Carpenter <br /> C. Field Geologist/Site Safety Officer: _ <br /> 4. Safety and Health Hazards on Site: <br /> a. Hazard associated with drill rig and drilling operations. <br /> b. Hazards associated with hazardous materials as summarized in Section B-1. <br /> C.Hazards associated with other site conditions(traffic,heat/cold exposure,overhead <br /> and underground utilities, etc.): Traffic on adjacent streets, and pedestrians on the <br /> sidewalks. Overhead and underground utilities adjacent to the site. <br /> 5. Personal Protective Equipment to be used: <br />' a. During normal work: as per Section B-4 <br /> b. During special operations (steam cleaning, equipment operation, etc.): as per <br /> 1 Section B4. <br /> c. During emergency response actions: as per Section B-4 <br />' 6. Work Practices to minimize risk: <br /> a. Be aware of heat stress symptoms: excessive fatigue, confusion, flushed or pale <br /> complexion, pulse racing, cramps, lack of perspiration. Drink plenty of fluid, and <br /> take frequent breaks in shade. <br /> b. Do not move equipment, or engage drilling tools without ensuring allclear. <br /> Ensure emergency shut off switches are working and all personnel familiar with the <br />` locations of the switches. <br /> I <br />