Laserfiche WebLink
i <br /> Logging of Borings <br /> Soil samples are logged using the Unified Soil Classification System Samples not selected <br /> for chemical analysis and the soil sampler shoe are extruded in the field for examination <br /> The texture, color, moisture, plasticity, and consistency of soil, the blow counts, and <br /> subjective evidence of hydrocarbons, such as soil staining, obvious product odor, and <br /> photoionization detector (or similar instrument) readings are noted in the field and on the <br /> Logs of Borings <br /> Sampling of Drill Cuttings <br /> Soil samples are collected from the stockpiled drill cuttings by driving a hand-operated <br /> percussion sampler fitted with a clean brass sleeve into the stockpiled soil The sleeve is <br /> removed from the sampler and promptly sealed with Teflon tape and plastic caps The <br /> sample is then labeled and placed in iced storage Chain-of-custody records are initiated by <br /> the geologist and accompany the samples to the analytical laboratory Pending the <br /> analytical results of the soil samples, Dillard Trucking of Byron, California, will arrange <br /> for disposal of the drill cuttings at an appropriate disposal facility <br /> Groundwater Monitoring Well Construction <br /> The groundwater monitoring well will be constructed in the boring with thread pointed, <br /> 4-inch-inner-diameter, Schedule 40 PVC casing No cherrucal cements, glues, or solvents <br /> are used in well construction The screened portion of the well consists of factory- <br /> perforated casing with 0 020-inch-wide slots The annular space in the wells is packed <br /> with #3 Lonestar sand to approximately 1 to 2 feet above the slotted interval A 3-foot- <br /> thick bentonite plug is added above the sand pack to prevent the cement from entering the <br /> well pack The remaining annulus is backfilled to grade with a bentonite cement slurry <br /> The well will be protected with a traffic-rated, cast-aluminum utility box equipped with a <br /> PVC skirt The box has a watertight seal to protect against surface-water infiltration and <br /> must be opened with a special wrench The design of this box discourages vandalism and <br /> reduces the possibility of accidental disturbance of the well <br /> Well Development <br /> EMCON waits a nunimum of 24 hours after well installation before developing the <br /> monitoring well to allow the grout to seal Before developing the well, a water sample is <br /> collected for subjective analysis from near the water surface in the well with a Teflon <br /> . bailer cleaned with a laboratory-grade detergent and deionized water The well is <br /> developed with a surge block and pump Well development continues until the discharge <br /> SAC\N\P70\0805\08051470 4BS-97\pa 1 A-2 Rev 0 10/9197 <br />