My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CALIFORNIA
>
2402
>
2900 - Site Mitigation Program
>
PR0539430
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2019 11:49:21 AM
Creation date
2/15/2019 11:43:35 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0539430
PE
2953
FACILITY_ID
FA0022537
FACILITY_NAME
WHITE ARROW LLC
STREET_NUMBER
2402
Direction
S
STREET_NAME
CALIFORNIA
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16707029
CURRENT_STATUS
01
SITE_LOCATION
2402 S CALIFORNIA ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Additional Assessment Workplan <br /> White Arrow <br /> 2402 South California Street <br /> Stockton,California 95206 <br /> Partner Project Number 14-117725.2 <br /> October 8,2014 <br /> Page 13 <br /> Subsurface Investigation Scope of Work <br /> The primary objective of the project is to delineate the extent of identified petroleum hydrocarbon <br /> impacts to soil along the southern edge of the subject property as a consequence of a release or releases <br /> from the former fuel oil tank and oil house. To accomplish this objective, Partner proposes to advance six <br /> soil borings(613 through B18). <br /> Field Activities <br /> Utility Clearance <br /> Partner will delineated the work area with white spray paint and notify Underground Services Alert (USA) <br /> North to clear public utility lines as required by law at least 48 hours prior to drilling activities. <br /> Permitting <br /> Prior to drilling, Partner will secure a boring permit from the EHD for soil sampling. <br /> Notification <br /> Partner will notify the property owner and the appropriate agencies a minimum of 5 business days prior <br /> to initiation of field activities. <br /> Health and Safety Plan <br /> Prior to commencement of site activity, the health and safety plan will be reviewed during a tail gate <br /> meeting with all on-site personnel involved in the project. <br /> Drilling Equipment <br /> The borings will be advanced with a truck-mounted direct-push drill rig. The ground surface is unpaved <br /> at each location. Prior to drilling, the boring will be cleared of utility lines by manually excavating the <br /> upper 3 feet of the borehole with hand auger equipment. <br /> Boring Locations <br /> Two of the borings will be advanced in the vicinity of the previously detected exceedances (at B4 and B5). <br /> Four step-out borings will be advanced to the northwest (one boring), north (two borings), and northeast <br /> (one boring) of the first two borings. The proposed boring locations are shown on Figure 2. <br /> Sampling Depths <br /> Each boring will be advanced to a terminal depth of 25 feet bgs, collecting soil samples continuously to <br /> the terminal depth. <br /> Equipment Decontamination <br /> Down-hole sampling equipment will be decontaminated between samples in a non-phosphate detergent <br /> and rinsed with distilled water. <br /> PARTNER <br />
The URL can be used to link to this page
Your browser does not support the video tag.