' 24 September 1999 <br /> ' AGE-NC Project No. 96-0232 <br /> Page 5 of 12 <br /> ' Preparation of Corrective Action Plan. <br /> 3.1. PERMITTING AND PRE-FIELD WORK ACTIVITIES <br /> Applicable site assessment permits will be submitted to the PHS-EHD. As required by PHS-EHD <br /> permitting, a health and safety plan will be prepared in accordance with Occupational Safety and <br /> ' Health Guidance Manual for Hazardous Waste Site Activities (National Institute for Occupational <br /> Safety and Health Administration, U.S. Coast Guard and U.S. Environmental Protection Agency, <br /> 1985). Prior to drilling activities, each proposed drilling location will be clearly marked and a utility <br /> ' clearance obtained through Underground Service Alert. <br /> ' 3.2. SOIL PROBE BORING ACTIVITIES <br /> ' Initially, AGE proposes to advance 10 soil probe borings at the site to evaluate soil-gas organic <br /> vapor concentrations in the vadose zone near the existing UST system; one soil probe boring will <br /> be utilized to collect soil samples to evaluate feasibility of bioremediation at the site. Additional <br /> ' probe borings may be required to completely delineate any impacted soil and/or ground water <br /> encountered. Proposed soil boring locations are illustrated in Figure 2. <br /> ' Based on the configuration of the existing UST system at the, AGE proposes advancement of probe <br /> borings to evaluate soil-gas organic vapor concentrations in the following locations: <br /> ' • Approximately 5 to 15 feet east of UST No. 1 beneath the main trench product piping area; <br /> • Approximately 25 to 35 feet east of UST No. 1 beneath the fueling dispenser area; <br /> ' • Approximately 5 to 15 feet east of UST No. 2 beneath the main trench product piping area; <br /> • Approximately 25 to 35 feet east of UST No. 2 beneath the fueling dispenser area; <br /> ' • Approximately 5 to 15 feet east of UST No. 3 beneath the main trench product piping area; <br /> • Approximately 25 to 35 feet east of UST No. 3 beneath the fueling dispenser area; <br /> ' • Approximately 5 to 15 feet southeast of UST No. 4 near the UST cavity; <br /> • Approximately 5 to 15 feet east of UST No. 4 near the UST system; <br /> • Approximately 5 to 15 feet west of UST No. 1 near the UST cavity; <br /> • An additional boring will be advanced approximately 10 to 20 feet west of MW-I to evaluate <br /> ' feasibility of bioremediation at the site; <br /> Initially, each soil-gas vapor probe boring will be advanced to 10 feet bsg; one soil probe boring will <br /> ' be advanced to 40 feet bsg for bioremediation analysis. AGE will advance probe borings at the site <br /> Adranred GeoEnviron mental,Inc. <br /> 1 <br />