' 15 January 2001 <br /> • AGE-NC Project No 96-0232 <br /> Page 6 of 20 <br /> On 23, 24 and 25 October 2000, a backhoe equipped with an 18-inch bucket was utilized to <br /> excavate soil in the above referenced trench-line to approximately 24-inches deep, additional trench- <br /> line was excavated in the landscaped area between wells EW-4 and EW-5 measuring 18-Inches deep <br /> by 18-inches wide Excavation cuttings were stockpiled in a northeast section of the site, and covered <br /> with plastic sheeting A map depicting the on-site trench system is depicted in Figure 11 <br /> 5 2 UNDERGROUND PIPING INSTALLATION <br /> On 26 and 27 October 2000, 2-inch diameter, schedule 80 PVC piping (process piping) and I-inch <br /> diameter, schedule 80 PVC electrical piping (electrical conduit) were installed in the on-site trench- <br /> line at approximately I8-inches bsg A manifold PVC piping system was utilized in the trench-line <br /> to connect the process piping system from each extraction well head to the ground water pump and <br /> treat system From the ground water extraction pump, electrical wiring was routed through individual <br /> one-inch diameter PVC conduit through the trench-line to the pump and treat system electrical <br /> control panel Following placement of all PVC piping, the trench-line was backfilled with imported <br /> 3/8-inch pea gravel to 8-inches bsg The remaining space was resurfaced with concrete, a plan view <br /> 10 <br /> drawing of the piping network is depicted in Figure 11 <br /> 1 5 3 GROUND WATER PUMP AND TREAT SYSTEM INSTALLATION <br /> Between 01 November and 10 November 2000, a ground water pump and treat system was installed <br /> at the site Prior to installation, a secondary containment(approximately 30 feel long by 15 feet wide) <br /> system was Installed inside the remediation system gated enclosure The secondary containment <br /> consisted of a 3-foot high wood berm and heavy duty polyethylene plastic liner attached to the floor <br /> Iand sides of the berm <br /> Four 1,000-gallon media vessels, one 1,000-gallon poly tank (holding tank), one process pump and <br /> one sediment filter chamber were installed for the ground water pump and treat system Initially, the <br /> influent piping was routed to a 1,000-gallon poly tank (holding tank) at the east-section of the gated <br /> enclosure to temporarily store extracted ground water prior to processing The holding tank was <br /> equipped with various water level float controls to control the rate at which extracted water was <br /> introduced into the treatment vessels, to allow coarser sediment to settle out prior to treatment and <br /> to provide safety shutoff capabilities A high float (high-high) was installed near the top of the <br /> holding tank and is designed to shut the entire system down if water level exceeds the high-high <br /> float A middle float{high-low)was installed near the middle of the holding tank and is designed to <br /> I turn on the process pump when water level exceeds the high-low float A low float was installed near <br /> the bottom of the holding tank (low-low) and is designed to turn off the process pump <br /> I <br /> Advanced GeoEnvuronmentai,Inc <br />