Laserfiche WebLink
* " 0 • <br /> . 07 December 2001 <br /> AGE Project No 96-0232 <br /> Page 8 of 9 <br /> pump which will be outfitted with automated electronic shut-off controls to control water entering <br /> the system AGE anticipates total ground water extraction flow between 20 and 25 GPM, therefore <br /> a surge pumping technique will be implemented at each well head to control the volume of produced <br /> water <br /> From each off-site extraction well head, extracted ground water will be routed through a sediment <br /> pre-filter and into the 1,000-gallon holding tank, from which it will pass through a process pump, <br /> a bag filter with gauges on to the first GAC vessel and subsequently the second and third GAC <br /> vessels Again, the GAC units are designed to adsorb as much gasoline compounds as possible prior <br /> to introduction into the Sun Solve vessels Following the GAC treatment, the water will be routed <br /> through three vessels of Sun Solve, which are connected in series The Sun Solve is intended <br /> specifically to adsorb MTBE Sample ports will be located in appropriate positions between and after <br /> the GAC and Sun Solve vessels for monitoring purposes <br /> 6 2 1 Off-site Ground Water Extraction Well Installation <br /> Installation of three ground water extraction wells is proposed utilizing a limited access truck- <br /> mounted drill rig equipped with 12-inch diameter hollow stem augers Hollow stem augers will be <br /> cleaned prior to advancement in each borehole The wells will be advanced to depths of <br /> approximately 35 feet bsg and completed with 6-inch diameter, schedule 40 PVC well casing <br /> emplaced through the hollow stem augers Each well will utilize twenty-five feet of slotted well <br /> casing (0 020-inch screen size) from 10 to 35 feet bsg A #3 Lonestar Lapis Luster sand will be <br /> poured down the annulus between the well casing and the inner wall of the hollow stem auger The <br /> filter pack will be placed adjacent to the screen from the bottom of the boring to a point <br /> approximately 2 feet above the top of the screen A nominal three-foot interval of bentonite pellets <br /> (annular seal)will be placed above the filter pack Portland cement will be utilized to grout from the <br /> annular seal to within a foot of surface grade A ground water extraction well construction diagram <br /> is depicted in Figure 7 <br /> 6 2 2 Off-Site Ground Water Extraction Piping System <br /> A network of two-inch diameter, schedule 80 PVC piping will be installed from Rocky's Restaurant <br /> property to Flag City Chevron property in a trench approximately 1 foot wide by 1 Meet deep The <br /> PVC piping will be routed from each off-site ground water extraction well head to a water holding <br /> tank, the holding tank will be directly connected to the GAC - Sunsolve ground water treatment <br /> system <br /> Advanced GeoEnvironmentsl,Inc <br />