My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0000689
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CAPITOL
>
6421
>
2900 - Site Mitigation Program
>
PR0522496
>
ARCHIVED REPORTS XR0000689
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2019 9:44:24 PM
Creation date
2/15/2019 4:07:51 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0000689
RECORD_ID
PR0522496
PE
2957
FACILITY_ID
FA0015317
FACILITY_NAME
FLAG CITY CHEVRON
STREET_NUMBER
6421
STREET_NAME
CAPITOL
STREET_TYPE
AVE
City
LODI
Zip
95245
APN
05532024
CURRENT_STATUS
02
SITE_LOCATION
6421 CAPITOL AVE
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
501
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
19 July 2000 <br /> AGE-NC Project No 96-0232 <br /> Page 2 of 29 <br /> • 02 May 2000 - Install multi-level well MW-8 <br /> 03 May 2000 - Install multi-level well MW-9, backfill boring <br /> 04 May 2000 - Re-install multi-level well MW-9 <br /> 05 May 2000 - Install multi-level well MW-12 <br /> 08 May 2000 - Install multi-level well MW-10, <br /> - Advancement of Geoprobe soil borings P18 through P24 <br /> 09 May 2000 - Install multi-level well MW-13, <br /> - Advancement of Geoprobe soil bonngs P25 through P29, <br /> Develop multi-level wells MW-8 and MW-9 <br /> 10 May 2000 - Install multi-level well MW-11 <br /> 11 May 2000 - Develop multi-level wells MW-10, MW-11, MW-12, and MW-13, <br /> - Collect water sample from Baker Tank (EW-1) <br /> 15, 16 May 2000 - Collect depth to ground water measurements in wells MW-8 through <br /> . MW-13, <br /> -Collect water samples from MW-13,Flag City municipal water well No <br /> 1 and No 2 (CSA-1 and CSA-2), MW-8 through MW-12 <br /> 18 May 2000 - Collect water sample from baker tank (EW-1) <br /> - 19 May 2000 - Advancement of Geoprobe borings P30, P31, P32, P34, and P35 <br /> 22 May 2000 - Collect soil sample SS-1 <br /> 25, 26 May 2000 - May monthly ground water monitonng and sampling event, <br /> - Collect water sample from Baker Tank (EW-1) <br /> 01 June 2000 - Collect depth to ground water measurements in wells MW-1 thru MW-13, <br /> - Collect water sample from Baker tank (EW-1) <br /> - 07 June 2000 - Collect depth to ground water measurements in wells MW-1 thru MW-13, <br /> - Collect water sample from Baker Tank (EW-1) <br /> - 15 June 2000 - Collect depth to ground water measurements in wells MW-1 thru MW-13, <br /> Adeanced GioEnNironmenta! Inc <br />
The URL can be used to link to this page
Your browser does not support the video tag.