Laserfiche WebLink
tl <br /> 'c <br /> MARCH 1995 <br /> QUARTERLY STATUS REPORT (CONTIlVUED) <br /> • Analytical results from previous sampling events <br /> Table 3 presents a summary of the analytical results from all previous groundwater <br /> sampling events <br /> Table 4 presents a summary of the analytical results from all previous soil sampling <br /> events. <br /> • Site map delineating contamination contours for groundwater and soil based on <br /> recent data <br /> Figure 3 1s a site plan that presents the analytical results from the groundwater samples <br /> collected on March 9, 1995. A "zero" line for groundwater contamination was not <br /> included in the figure because BTEX, TPH-D, and TPH-G parameters were not <br /> detected in any of the samples <br /> Figure 4 is a site plan that presents a summary of the analytical results from all the soil <br /> samples collected from the site. A TPH-D "zero" line and 10-ppm line are indicated in <br /> the figure <br /> • Estimates of the quantity of contamination remaining in soil and groundwater, <br /> and time for completing remediation <br /> Based on the results of the second supplemental site assessment, approximately 6,000 <br /> cubic yards of sail containing detectable concentrations of TPH-D are estimated to <br /> remain beneath the site. <br /> • Method of cleanup proposed or implemented to date <br /> No cleanup has been proposed or implemented. <br /> • Times and dates equipment was not operating, cause of shutdown, and a <br /> corrective action plan to ensure similar shutdowns do not reoccur <br /> Not Applicable <br /> PARPSSYR01WOL1 WP1727211108969108969L01 DOC <br /> 3 <br />