My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
129
>
2900 - Site Mitigation Program
>
PR0503658
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2019 4:50:46 PM
Creation date
2/22/2019 2:22:26 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0503658
PE
2950
FACILITY_ID
FA0005929
FACILITY_NAME
FIORE, FRANK
STREET_NUMBER
129
Direction
E
STREET_NAME
CENTER
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
22309120
CURRENT_STATUS
02
SITE_LOCATION
129 E CENTER ST
P_LOCATION
04
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' WHFEnvironmentallponsnitants, Inc. • <br /> Health & Safety Plan <br /> ' Page. 3 <br /> 1 <br /> ' 2.0 SAFETYIMPLEMENTATION <br /> ' The provisions of the WHF Environmental Consultants, Inc. Health and Safety Plan are <br /> mandatory for all personnel associated with the site project and operations. <br /> A complete background review and site visitation will be conducted in order to deter-mine <br /> whether specific amendments are to be made to the Health and Safety Plan based on <br /> specific characteristics which may exist on the job site. Any suspected hazards associated <br /> with the on-site operation which exposure to, via inhalation or skin absorp-tion, to such as <br /> suspected carcinogens or human sterilants, will be documented and specific guidance will <br /> be developed and added to this Health and Safety Plan as Appendices. <br /> ' A defined project site layout is paramount to the safe completion of all remedial site in- <br /> vestigations. The project site layout has built-in safety features. The site is divided into <br /> ' three zones. The following list defines the required personnel protective equipment. <br /> ' 21 Personnel Protective Equipment (PPE) <br /> Personnel who will be working in or around the exclusion zone of the job site will <br /> ' use the following protective equipment and measures as warrant by the Project <br /> Manager: <br /> - Coveralls as an undergarment <br /> ' Saranex outer garment <br /> - Sample gloves (inner) <br /> - PVC, Nitrile or Neoprene outer gloves <br /> - Hard hat <br /> - Steel toe boots <br /> - Robars or Tingley boots <br /> ' - Full face-piece respirator with R53HE cartridges (a combination of organic <br /> vapor, acid gas, pesticide, radionuclide, high efficiency filter). Note that <br /> cartridges should be changed daily. <br /> - All joints to be taped <br /> Self-contained air will be utilized if project dictates <br /> ' More stringent protective equipment requirements will be implemented if <br /> necessary. This determination will be made by the project supervisor after review <br /> ' of the materials to be handled, the ambient monitoring data, consultation with on- <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.