Laserfiche WebLink
HE( .1VEL <br /> SWRCB,January 2002 J U L 31 Z0115 Page of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: 19 Piping Manufacturer 0 Industry Stan' rro oral Engineer <br /> ❑Other(Spec) <br /> Test Method Used: 19 Pressure ❑Vacuum ❑Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used:Nitrogen/pressure gauge Equipment Resolution: 0.50psi <br /> PipingRun#87Syp PipingRun#87Mas PipingRun#87S1a Piping Run# 91 <br /> Piping Material: FRP FRP FRP FRP <br /> Piping Manufacturer: AO Smith AO Smith AO Smith AO Smith <br /> Piping Diameter: 2"-3" 2"-3" 2"-3" 2"-3" <br /> Length of Piping Run: 4 18, 140' 1 2' 140 ' <br /> Product Stored: Unleaded Unleaded Unleaded Premium <br /> Method and location of Test boot Test boot Test boot Test boot <br /> piping-run isolation: nside stp sum Inside stp sum inside stp su inside stp sum <br /> Wait time between applying <br /> pressure/vacuum/water and 1 0 m i n . 1 0 m i n 1 0 m i n 1 0 m i n <br /> starting test <br /> Test Start Time: 10:20am 10: 10am 11 :05am 11 :20am <br /> Initial Reading(RO: 5psi 5psi 5ps405pm <br /> 5psi <br /> Test End Time: 1 1 :2 0 am 1 1 : 1 0 am 1 2: 1 2:2 0 pm <br /> Final Reading(RF): 5psi 5psi 5ps5psi <br /> Test Duration: 1 hr 1 hr 1 hr1 hr <br /> Change in Reading(RF-R,): 0 .0 p s i 0.0 p s i 0.00.0psi <br /> Pass/Fail Threshold or ±O.Opsi ±O.Opsi ±O. p ±O.Opsi <br /> Criteria: <br /> Test Result: a Pass ❑Fail 1a Pass ❑Fail 9 Pass ❑Fait )U Pare ❑Fail <br /> Comments (include information on repairs made prior to testing,and recommended follow-upforfailed tests) <br />