Laserfiche WebLink
'IE4,HVEE) <br /> S WRCB,January 2002 J U L 3 Y 2015 Page of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: 0 Piping Manufacturer 0 Industry Standard ;a ` " o Engineer <br /> 0 Other(Specify) <br /> Test Method Used: CKPressure 0 Vacuum 0 Hydrostatic <br /> 0 Other(Specify) <br /> Test Equipment Used: Nitrogen/pressure gauge Equipment Resolution: 0.50psi <br /> Piping Run#8 7 S/1"1 Piping Run# Piping Run# Piping Run# <br /> Piping Material: FRP <br /> Piping Manufacturer: AO Smith <br /> Piping Diameter: 211-311 <br /> Length of Piping Run: 12' <br /> Product Stored: Unleaded <br /> Method and location of Test boot <br /> piping-run isolation: insde stp sump <br /> Wait time between applying 1 0 m i n <br /> pressure/vacuum/water and <br /> starting test: <br /> Test Start Time: 1 0: 3 0 am <br /> Initial Reading(RI): 5 p s i <br /> Test End Time: 1 1 : 3 0 am <br /> Final Reading(RF): 5 p s i <br /> Test Duration: 1 h r <br /> Change in Reading(RF-Rj): 0.0 p s i <br /> Pass/Fail Threshold or ±0.O p s i <br /> Criteria: <br /> Test Result. a Pass 0 Fail ❑ Pass 0 Fail 0 Pass 0 Fail ❑ Pass 0 Fail <br /> Comments (include information on repairs made prior to testing and recommended follow-up far failed tests) <br />