Laserfiche WebLink
EC <br /> SWRCB,January 2002 JUL 09 12 015 Page of <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: 0 Sump Manufacturer 0 Industry Standard RProfessional Engineer <br /> 0 Other(Specify) <br /> Test Method Used: ❑Pressure C Vacuum Hydrostatic <br /> ❑Other(.Spec) <br /> Test Equipment Used: INCON TS—STS -Equipment Resolution: 0 .0001 " <br /> Sump#87Syphon Sump487Master Sump# 87Slave Sump# 91 <br /> Sump Diameter: 52" 52" 52" 52" <br /> Sump Depth: 5711 5711 5811 5 7" <br /> Sump Material: FRP FRP FRP FRP <br /> Height from Tank Top to Top of 1 8 1 1 2711 2 2" 2511 <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest 3611 38" 3211 32" <br /> Electrical Penetration: _ <br /> Condition of sump prior to testing: Clean Clean Clean Clean <br /> Portion of Sump Tested' 3811 4011 3411 3 2" <br /> Does turbine shut down when :P Yes Ll No 0 NA <br /> sump sensor detects liquid(both 3 Yes ❑No ❑NA XYes ❑No DNA XYes 0 No DNA <br /> roduct and water)?* <br /> Turbine shutdown response time 4 s e c 3 s e c 3 s e c 5 s e c <br /> Is system programmed for fail-safe Rl Yes ❑No Cl NA NYes ElNo ElNA XYes ONo ONA 25Yes 0 No DNA <br /> shutdown?* <br /> Was fail-safe verified to be K7 Yes ❑No n NA RYes ONo ENA IKYes ONo DNA 19Yes ONo DNA <br /> operational?* <br /> Wait time between applying <br /> pressure/vacuum/water and starting 10 in`Ln 1 O m i n 1 Om i n " O m i n <br /> test: <br /> EReading <br /> 10:43am 10 :43am 11 :45am 11 :45am <br /> ): 4 . 3425 5.6689" 2. 3401 " 3.7490" <br /> 10 : 58am 10:58am 12:00pm 12:OOpm <br /> ): 4 .3417" 5. 6 6 8 8" 2.3398" 3 .7491 <br /> " <br /> Test Duration: 1 5min 5min 1 5min 1 5min <br /> 1 <br /> Change in Reading(RF-Ri): 0 .0 0 0 8" 0. 000111 0 .0003" 0 .0 0 01 " <br /> Pass/Fail Threshold or Criteria: ±0.002- ±0.002 ±0 .002" ±0 .0 0 2" <br /> Test Result: 1P Pass ❑Fail :k1 Pass 0 Fail 9 Pass D Fail Xl Pass 0 Fail <br /> f <br /> Was sensor removed for testing? V Yes ❑No ❑NA Ik Yes ONo ❑NA ( Yes t7 No ❑NA XYes ONo DNA <br /> Was sensor properly replaced and 30 Yes ❑No 0 NAYes p No ❑NA %Yes ❑No ❑NA �4 Yes ❑No ❑NA <br /> verified functional after testin ? <br /> Comments—(include information on repairs made prior to testing and recommended follow-up for failed tests) <br /> If the entire depth of the sump is not tested,specify how much was tested. If the answer to of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />