My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2010 - 2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PATTERSON PASS
>
25775
>
2300 - Underground Storage Tank Program
>
PR0231708
>
COMPLIANCE INFO 2010 - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2019 1:59:08 PM
Creation date
2/26/2019 11:59:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010 - 2015
RECORD_ID
PR0231708
PE
2361
FACILITY_ID
FA0003619
FACILITY_NAME
ARP MINI MART CORP
STREET_NUMBER
25775
Direction
S
STREET_NAME
PATTERSON PASS
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
20910004
CURRENT_STATUS
01
SITE_LOCATION
25775 S PATTERSON PASS RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
222
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
T", <br /> [AEGEIV - - , <br /> S WRCB,January 2002 J U L 3 1 2015 Page of_- <br /> 7. UNDER-DISPENSER CONTAINM!jT UDC TE~S ING <br /> Test Method Developed By: ❑UDC Manufacturer ❑Industry Sfandarcl" X Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ❑Pressure ❑Vacuum X Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: INCON TS—STS Equipment Resolution: 0 .0001 " <br /> UDC# 1 /2 UDC# 3/4 UDC# 5/7 UDC# 7/8 <br /> UDC Manufacturer: Environ Environ Environ Environ <br /> UDC Material: FRP FRP FRP FRP <br /> UDC 29" 29" 29" 29" <br /> Height from UDC Bottom to Top 1011 10" 1011 1 0" <br /> of Highest Piping Penetration: <br /> Height from UDC Bottom to 6" 611 <br /> 611 611 <br /> Lowest Electrical Penetration: <br /> Condition of UDC prior to Clean Clean Clean Clean <br /> testing: <br /> Portion of UDC Tested 1211 1211 1211 1211 <br /> Does turbine shut down when N Yes ❑No ❑NA <br /> UDC sensor detects liquid(both :E Yes U No ❑NA RYes U No ❑NA 91 Yes ❑No ❑NA <br /> product and water)?* <br /> Turbine shutdown response time 5 s e c 6 s e c 5 s e c 4 s e c <br /> Is system programmed for fail- F9 Yes ❑No ❑NA IXYes El No [INA XYes 11 No 11 NA X1 Yes ❑No DNA <br /> safe shutdown?' <br /> Was fail-safe verified to be 9 Yes ❑No ❑NA [NYes ❑No ❑NA 19Yes ❑No ❑NA X1 Yes ❑No ❑NA <br /> operational?' <br /> Wait time between applying <br /> pressure/vacuum/water and 1 0 m i n 1 0 m i n 1 0 m i n 1 0 m i n <br /> starting test <br /> Test Start Time: 9 :50am 9: 50am 9:31 am 9 :31 am <br /> Initial Reading(111): 3.3265' 2.5561 2.9386" 4.2236" <br /> Test End Time: 10:05am 10:05am 9 :46am 9: 46am <br /> Final Reading Rr : 3.3258" 2.5561 " 2.9397" 4 .2239" <br /> Test Duration: 1 5min 1 5min 1 5min 1 5min <br /> IT— <br /> Change in Readi RI : 0. 0007" 0.0000" 0 000 �� ±0.002" <br /> Pass/Fail Threshold or Criteria: ±0.0 0 2" ±0.0 0 2" ±0.0 0 2 <br /> Test Result: ta Pass ❑Fail N Pass ❑Fail :& Pass ❑Fail :11 Pass ❑Fail <br /> Was sensor removed for testing? N Yes U No U NA xl Yes U No DNA i�Yes U No U NA Yes ❑No ❑NA <br /> Was sensor properly replaced and X Yes ❑No ❑NA -4j Yes ❑No ❑NA •aYes U No ❑NA !S Yes ❑No LINA <br /> verified functional ager testing? <br /> Comments (include information on repairs made prior to testing and recommended follow-upforfailed tests) <br /> If the entire depth of the UDC is not tested,specify how much was tested. 1f the answer to fly of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire UDC must be tested. (See SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.