My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2010 - 2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PATTERSON PASS
>
25775
>
2300 - Underground Storage Tank Program
>
PR0231708
>
COMPLIANCE INFO 2010 - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2019 1:59:08 PM
Creation date
2/26/2019 11:59:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010 - 2015
RECORD_ID
PR0231708
PE
2361
FACILITY_ID
FA0003619
FACILITY_NAME
ARP MINI MART CORP
STREET_NUMBER
25775
Direction
S
STREET_NAME
PATTERSON PASS
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
20910004
CURRENT_STATUS
01
SITE_LOCATION
25775 S PATTERSON PASS RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
222
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECEIVED <br /> SEr 17 2015 <br /> SWRCB,January 2002 ENVIRONMENTAIPage^Uf <br /> 5. SECONDARY PIPE TESTING t4Cs1T1.inC:DAOT4ACK1T <br /> Test Method Developed By: ❑Piping Manufacturer ❑Industry Standard r Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: E9Pressuire f,1 Vacuum ❑Hydrostatic <br /> D Other(Specify) <br /> Test Equipment Used: Nitrogen/pressure gauge <br /> Equipment Resolution: 0 .50psi <br /> 1pipingRun#87S/M Piping Run# Piping Run# Piping Run# <br /> Piping Material: FRP <br /> Piping Manufacturer: AO Smith <br /> Piping Diameter: <br /> 2"-3" <br /> Length of Piping Run: 1 2 ' <br /> Product Stored: Unleaded <br /> Method and location of T e s t b o o t <br /> insde s tp sump <br /> piping-run isolation: <br /> Wait time between applying 10min <br /> pressure/vacuum/water and <br /> starting test: <br /> Test Start Time: 10: 3 0 am <br /> Initial Reading(Ri): 5 p S i <br /> Test End Time: 11 : 3 0 am <br /> Final Reading(RF): 5ps i <br /> Test Duration: 1 h r <br /> Change in Reading(RF-R): O .O p s i <br /> Pass/Fail Threshold or +-0. Ops i <br /> Criteria: <br /> � Pass Fail ❑ Pass ❑Fail Ci Pass [7 Fall D Pass ❑Fail <br /> Test Result: <br /> Comments—(include information on repairs made prior to testing, and recommended ollow-u or ailed tests <br />
The URL can be used to link to this page
Your browser does not support the video tag.