Laserfiche WebLink
RECEIVED <br /> SEr 17 2015 <br /> SWRCB,January 2002 ENVIRONMENTAIPage^Uf <br /> 5. SECONDARY PIPE TESTING t4Cs1T1.inC:DAOT4ACK1T <br /> Test Method Developed By: ❑Piping Manufacturer ❑Industry Standard r Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: E9Pressuire f,1 Vacuum ❑Hydrostatic <br /> D Other(Specify) <br /> Test Equipment Used: Nitrogen/pressure gauge <br /> Equipment Resolution: 0 .50psi <br /> 1pipingRun#87S/M Piping Run# Piping Run# Piping Run# <br /> Piping Material: FRP <br /> Piping Manufacturer: AO Smith <br /> Piping Diameter: <br /> 2"-3" <br /> Length of Piping Run: 1 2 ' <br /> Product Stored: Unleaded <br /> Method and location of T e s t b o o t <br /> insde s tp sump <br /> piping-run isolation: <br /> Wait time between applying 10min <br /> pressure/vacuum/water and <br /> starting test: <br /> Test Start Time: 10: 3 0 am <br /> Initial Reading(Ri): 5 p S i <br /> Test End Time: 11 : 3 0 am <br /> Final Reading(RF): 5ps i <br /> Test Duration: 1 h r <br /> Change in Reading(RF-R): O .O p s i <br /> Pass/Fail Threshold or +-0. Ops i <br /> Criteria: <br /> � Pass Fail ❑ Pass ❑Fail Ci Pass [7 Fall D Pass ❑Fail <br /> Test Result: <br /> Comments—(include information on repairs made prior to testing, and recommended ollow-u or ailed tests <br />