My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2016 - 2017
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PATTERSON PASS
>
25775
>
2300 - Underground Storage Tank Program
>
PR0231708
>
COMPLIANCE INFO 2016 - 2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2023 2:13:59 PM
Creation date
2/26/2019 12:07:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016 - 2017
RECORD_ID
PR0231708
PE
2361
FACILITY_ID
FA0003619
FACILITY_NAME
ARP MINI MART CORP
STREET_NUMBER
25775
Direction
S
STREET_NAME
PATTERSON PASS
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
20910004
CURRENT_STATUS
01
SITE_LOCATION
25775 S PATTERSON PASS RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
506
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br />� .1 <br />B-5) The main fitting body (Item A) should be installed to <br />the outside first. Then apply adhesive as shown (Fig. 135). <br />FhFuz[gaz M, <br />The Adhesive Injection Port on the fitting body <br />must be at the 12 -o -Clock or North Position. <br />B.6) Apply adhesive to the Main Body's outer surface <br />(Fig. 135) 360° where shown. <br />mAY - 3 2017 <br />-. - !T <br />Adhesive <br />Injection <br />Port <br />X) <br />B.7) After applying adhesive to all contact areas (Fig. 1135) <br />Apply the flange over the fitting and to the wall. <br />13.8) Apply the Bravo Clamp immediately as shown in Fig. B8. Install clamp <br />shown to the body roughly 1/4" from the face and tighten. Then hand -tighten <br />each bolt so it is snug. Apply a 1/4 - 1/2 turn to each bolt evenly until the <br />clamp starts to slide away from the wall and flush with the face of the fitting. <br />B.9) Apply a generous bead of adhesive as shown. (Fig. 139). <br />B. 1 0) Glue all penetration fittings and allow to cure following the <br />pipe manufacturers adhesive instructions. <br />7 ii -F -Series -1 X -SS -11 A <br />Adhesive <br />Item B <br />Adhesive <br />OUTSIDE <br />Install Main body to outside of sum <br />Install the loo e Flange <br />and apply adhesive to areas shown <br />and use gloved finger to run a <br />generous bead along joint. <br />B.7) After applying adhesive to all contact areas (Fig. 1135) <br />Apply the flange over the fitting and to the wall. <br />13.8) Apply the Bravo Clamp immediately as shown in Fig. B8. Install clamp <br />shown to the body roughly 1/4" from the face and tighten. Then hand -tighten <br />each bolt so it is snug. Apply a 1/4 - 1/2 turn to each bolt evenly until the <br />clamp starts to slide away from the wall and flush with the face of the fitting. <br />B.9) Apply a generous bead of adhesive as shown. (Fig. 139). <br />B. 1 0) Glue all penetration fittings and allow to cure following the <br />pipe manufacturers adhesive instructions. <br />7 ii -F -Series -1 X -SS -11 A <br />
The URL can be used to link to this page
Your browser does not support the video tag.