Laserfiche WebLink
DEMOLITION GENERAL NOTES: <br /> A. ALL EXISTING PIPING INDICATED ON PLAN WAS TAKEN FROM EXISTING <br /> MECHANICAL PLANS AND/OR FIELD OBSERVATION AND SHALL NOT BE <br /> 9 10 11 CONSIDERED 100 PERCENT ACCURATE. CONTRACTOR SHALL VERIFY <br /> LOCATION OF ALL EXISTING SYSTEMS PRIOR TO CONSTRUCTION AND <br /> SHALL NOTIFY THE OSR OF ANY POTENTIAL CONFLICTS. <br /> B. CONTRACTOR IS RESPONSIBLE FOR HAVING A THOROUGH KNOWLEDGE OF ALL <br /> DRAWINGS,SPECIFICATIONS&EXISTING CONDITIONS FOR BIDDING PURPOSES. NO <br /> ADDITIONAL COMPENSATION SHALL BE ALLOWED BECAUSE OF CONDITIONS THAT <br /> OCCUR DUE TO FAILURE TO FAMILIARIZE WORKERS WITH THIS KNOWLEDGE. <br /> C. BELOW SLAB(BURIED)PIPING ABANDONED IN PLACE SHALL BE CAPPED, PLUGGED TARGET® <br /> AND CONCEALED. PLUGGING AND CAPPING SHALL BE DONE IN A MANNER AS TO <br /> ALLOW REOPENING AND REUSE LATER. ABOVE SLAB PIPING SHALL NOT BE <br /> ABANDONED IN PLACE; REMOVE PIPING BACK TO MAIN WHERE SHOWN ON PLANS. 1 000 N ICOLLET MALL <br /> 3 MINNEAPOLIS, MN 55403 <br /> D. PATCHING OF PENETRATIONS WHERE PIPING IS REMOVED SHALL BE BY <br /> GENERAL CONTRACTOR. <br /> E. CONCRETE CUTS(BY GENERAL CONTRACTOR)SHALL BE STRAIGHT AND <br /> CLEAN. REPLACE SLAB WITH CONCRETE FLUSH AND SMOOTH WITH <br /> 4 5 ADJACENT SURFACE. _ <br /> F. FIELD VERIFY LOCATIONS AND QUANTITY OF ALL EXISTING EQUIPMENT, <br /> F FIXTURES AND PIPING NECESSARY TO COMPLETE SCOPE OF WORK. <br /> G. ARRANGE ALL REQUIRED WORK TO KEEP DISRUPTIONS TO STORE OPERATIONS TO A <br /> MINIMUM. COORDINATE DISRUPTIONS WITH TARGET OSR AND STORE MANAGER. <br /> I I � <br /> H j INDICATED TO BE REMOVED-ALL REMOVED EQUIPMENT SHALL BE DC ENGINEERING <br /> DISPOSED OF BY CONTRACTOR UNLESS NOTED AS Careful listening. Dynamic solutions. <br /> RELOCATED/RETAINED IN DEMOLITION PLANS/ PROVIDE OSR&TARGET FACILITIES ANAG MANAGEMENT RST RIGOHT OF g g'net <br /> www.d(en ineerin <br /> 4 5 REFUSAL ON REMOVED OR DEMO'ED EQUIPMENT. Phone-.208.288.2181 Project:1 8TAR1 7 <br /> I I <br /> 2 J. HALF TONE INDICATES EXISTING CONDITIONS. <br /> (EX)SW TYP.TEXT OF EXISTING CONDITIONS-CONTRACTOR SHALL <br /> I I <br /> co�� <br /> VERIFY ALL EXISTING CONDITIONS. <br /> K. SUBMIT(2)COPIES OF REDLINED AS-BUILT UPDATES. ONE COPY SHALL BE <br /> RETAINED AT THE STORE. RETURN A SECOND COPY TO THE OSR TO BE <br /> FORWARDED TO THE MECHANICAL ENGINEER. <br /> I I <br /> L. CONTRACTOR SHALL COORDINATE ALL PHASES OF DEMOLITION WITH <br /> ARCHITECTURAL DEMOLITION PLANS. <br /> I I <br /> GENERAL NOTES: <br /> 4) <br /> A. CONTRACTOR SHALL COORDINATE WITH CASE MANUFACTURER AND SPECIFIC <br /> INSTALLATION REQUIREMENT FOR FINAL POINTS OF CONNECTION AND PIPE ROUTING <br /> THRU THE CASEWORK. <br /> B. PLUMBING CONTRACTOR SHALL COORDINATE INSTALLATION OF VACUUM PIPING WITH <br /> 2 REFRIGERATION CONTRACTOR PRIOR TO REFRIGERATED CASE INSTALLATIONS. <br /> C. ALL CONDENSATE PIPE BRACING AND INSTALLATION REQUIREMENTS MUST COMPLY <br /> WITH DETAILS ON SHEET P431. <br /> D. ALL PIPING, INSTALLATION AND INSTALLATION MATERIALS BY PLUMBING <br /> CONTRACTOR.CONDENSATE VACUUM PIPING SHALL BE SCHEDULE 40 PVC PRESSURE <br /> (E)1 1/2"CW - PIPE WITH DWV FITTINGS AT CHANGE OF DIRECTION FROM VERTICAL TO HORIZONTAL. Date No. Description <br /> E. REMOVE DEBRIS FROM INSIDE REFRIGERATED CASES. FLUSH OUT ALL PIPING AND 01/17/19 ISSUED FOR PERMIT <br /> DRAINAGE SYSTEMS PRIOR TO CONNECTION TO EQUIPMENT. <br /> F. ALL HORIZONTAL CONDENSATE PIPING IN STOCK ROOM SHALL BE INSTALLED A <br /> MINIMUM OF 16'-0"AFF <br /> G. REFER TO PLUMBING EQUIPMENT SCHEDULE ON SHEET P601 FOR INDIVIDUAL BRANCH <br /> ® PIPE SIZES TO FIXTURES AND ROUGH-IN REQUIREMENTS. <br /> H. COORDINATE PLUMBING FIXTURE LOCATION AND MOUNTING HEIGHTS WITH <br /> ARCHITECTURAL DOCUMENTS. <br /> N I. COORDINATE THE ROUTING OF WATER AND VENT PIPING WITH STRUCTURE, CEILING <br /> W ELEVATION,SPRINKLER PIPING, DUCTWORK, ELECTRIC PANEL BOARDS AND ALL <br /> OTHER TRADES. <br /> 2 J. EXPOSED WATER AND VENT PIPING SHALL BE RUN ABOVE THE BOTTOM CHORD OF <br /> BAR JOIST AND JOIST GIRDER. <br /> K. SEE DETAILS 2/P601,3/P601 AND 4/P601 FOR PIPE BRACING REQUIREMENTS. <br /> I I I <br /> KEYNOTES: <br /> E - - - - - - - - - - - - - - - 9❑ EXISTING PIPE ACCUMULATOR TO BE REUSED WITH NEW CASE.SEE DETAILS ON SHEET <br /> P431. <br /> EXISTING VACUUM PIPING AND ACCUMULATORS SHOWN LIGHT ARE TO REMAIN. <br /> I I <br /> 3❑ PROVIDE NEW ACCUMULATOR FOR NEW REFRIGERATED CASE.SEE DETAILS ON SHEET <br /> 2 P431.ANCHOR LOWER MAIN, PIPE ACCUMULATOR, SENSOR PIPE AND VERTICAL LIFT TO <br /> I I04 <br /> WALL. <br /> SALES w <br /> ....... <br /> 102 ® PROVIDE SLOPE MAKE UP TRANSITIONS AS REQUIRED. <br /> {� 5❑ CONNECT NEW VACUUM PIPING TO EXISTING. FIELD VERIFY SIZE AND LOCATION. <br /> O ` <br /> 2 2 2 2 <br /> I <br /> I 2 <br /> I I � <br /> L)L)L)L) ----------- L) <br /> 4 <br /> I <br /> I <br /> I I � <br /> I <br /> � I <br /> I � � <br /> I ` I <br /> 2 <br /> I I � <br /> I � <br /> QPOFESS/ON <br /> (� H. 4414q <br /> Er 31885 M <br /> P: 12/31/19 <br /> I I <br /> I <br /> 2 `rTq FFCHAN\G��Q�\P <br /> OF CAS\ <br /> I I � <br /> N I <br /> w <br /> I I � <br /> 2 2 2 2 I <br /> I <br /> DATE: 01/17/2019 EXP: 12/31/2019 <br /> I <br /> 2 <br /> I <br /> p - - - - - - - - - - � - - - - - - - - - - - - I - - c0 <br /> ' Q <br /> I <br /> U <br /> LU <br /> 2 <br /> 1 2 2 12 2 <br /> I <br /> I I— <br /> I I i i Q <br /> I <br /> I I <br /> 2 w <br /> I WI I <br /> J <br /> Uzi: <br /> (7 w <br /> i <br /> I <br /> I <br /> Z <br /> O <br /> - - O <br /> - 00 <br /> ' N <br /> � I <br /> U � <br /> w- <br /> 2 <br /> I <br /> I <br /> Project Number <br /> T-0738 <br /> I I <br /> Config: LL <br /> Drawn By B. SMEAD <br /> I I <br /> Checked By <br /> (E)CO J. HAM M <br /> I I <br /> 1 2 2 2 2 <br /> C - - - - - - - - - - - � - - - - - - - - - - � - - - - - - - - - - - - <br /> MARKET PLUMBING <br /> PLANS <br /> 1 MARKET PLUMBING PLAN <br /> P411 SCALE: 1/4"=1'-0" <br /> P41 1 <br /> PLAN NORTH <br /> 1/17/2019 1 :22:58 PM <br />