Laserfiche WebLink
4 <br /> h" KLEINFELDER <br /> File No. 20-4054-01.E01 <br /> May 1, 1997 <br /> Final Geotechnical Investigation Report <br /> We propose to prepare the final geotechnical investigation report by drilling three (3) borings to <br /> depths between 15 and 25 feet below the existing ground surface. Two (2) of the borings will be <br /> drilled within the proposed building footprint and one (1) will be drilled in the parking area. The <br /> borings will be drilled with truck-mounted drilling equipment using hollow-stem augers. The <br /> purpose of our geotechnical investigation will be to evaluate the surface and sub-surface soil <br /> conditions at the site and to provide recommendations for the following items: <br /> • Plot plan and vicinity map showing the approximate locations of site and field <br /> explorations performed for our investigation <br /> • Log of test borings <br /> • Results of laboratory tests <br /> • Recommended type and depth of foundations including maximum allowable soil and <br /> lateral earth pressures <br /> • Recommended support of concrete slab-on-grade floors <br /> • Recommended site preparation and grading <br /> • Recommended pavement sections <br /> An Kleinfelder field engineer or geologist will maintain continuous logs of the soils encountered in <br /> the borings and will obtain samples for visual observation, classification, and laboratory testing. <br /> Laboratory tests will be performed on selected soil samples obtained from the borings in order to <br /> evaluate the moisture, density, strength, gradation, and compressibility characteristics of the <br /> materials encountered. In addition, one bulk soil sample for Resistance-Value(R-Value)testing for <br /> use in pavement sections design will be obtained of the near-surface soils from the approximate <br /> locations of the proposed paved areas. The results of our field explorations, laboratory testing, and <br /> engineering analyses will be summarized in a written report prepared under the guidance of a <br /> registered geotechnical engineer. <br /> In preparing our report, our firm will make use of existing information obtained from previous <br /> projects in the site area for which we have provided services over the last 36 years that Kleinfelder, <br /> Inc. has been in existence. These projects include such diverse projects as the Tracy Auto Plaza, <br /> regional Safeway Distribution Center, West Valley Mall, various projects at Tracy Community <br /> Memorial Hospital, Market Wholesale Warehouse, Leprino Foods, Orchard Supply Hardware <br /> distribution center, Costco Distribution Center, Tracy Outlet Mall, Tracy Police Station, numerous <br /> subdivisions within the City of Tracy, and the U.S. Cold Storage facility. <br /> 20-4054-OI.E01-G0112017P036 Page 4 of 7 Copyright 1997 Kleinfelder,Inc. <br />