Laserfiche WebLink
5. SECONDARY PIPE TESTING <br />Test Method Developed By: ❑ Piping Manufacturer ✓❑ Industry Standard ❑ Professional Engineer <br />❑ Other (Specify) <br />Test Method Used: 0✓ Pressure ❑ Vacuum ❑ Hydrostatic <br />❑ Other (Specify) <br />"fest Equipment Used: Test Reducer Boots, Nitrogen and Gauges <br />Piping Run # 87 Piping Run # 91 <br />Piping Material: Poly Poly <br />Equipment Resolution: 0.5% of span PSI <br />Piping Rijn # Diesel Piping Run # <br />Poly <br />Piping Manufacturer: <br />Western Fiberglass <br />Western Fiberglass <br />Western Fiberglass <br />Piping Diameter: <br />2" <br />2" <br />2" <br />Length of Piping Run: <br />100, <br />100, <br />100' <br />Product Stored: <br />Gasoline <br />Gasoline <br />Diesel <br />Method and location of <br />i in -run isolation: <br />Reducer Boots/Fitting <br />Reducer Boots/Fitting <br />Reducer Boots/Fitting <br />Reducer Boots/Fitting <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />10 Minutes <br />10 Minutes <br />10 Minutes <br />10 Minutes <br />Test Start Time: <br />Initial Reading (R1): <br />PSI <br />PSI <br />PSI <br />PSI <br />Test End Time: <br />Final Reading (RF): <br />PSI <br />PSI <br />PSI <br />PSI <br />Test Duration: <br />1 hour <br />1 hour <br />1 hour <br />1 hour <br />Change in Reading (RF -R,): <br />Pass/Fail Threshold or <br />Criteria: <br />0 <br />0 <br />0 <br />0 <br />Test Result: <br />❑ Pass ❑ Fail <br />❑Pass ❑ Fail <br />❑Pass ❑ Fail <br />❑ Pass ❑ Fail <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />87, 91, Diesel Piping failed Visually due to jumper lines in UDC's. <br />RECEIVED <br />OrT 2 0 2012 <br />ENVIRONMENTAL HEALTH <br />PERMIT/SERVICES <br />