Laserfiche WebLink
' , <br /> o C <br /> 6. PIPING SUMP TESTING <br /> '"V 14 2014 <br /> Test?Method Developed BY: ❑ Sump Manufacturer ® Industry Standard ❑Professional Engineer <br /> p other(specifv� ENV( __- ­ HEALTH <br /> "- <br /> Test Method Used: ❑ Pressure ❑Vacuum ®Hydwstatic ijazNT <br /> ❑Other(Spec) <br /> Test Equipment Used: Incon Sump Tester ; Equipment Resolution: +1- 0.002" j <br /> STP Sump#87 STP Sump#91 STP Sump# Diesel ;) <br /> Sump Diameter: 42" 42" 42" <br /> Sump Depth: 72" 73" 73" <br /> Sump Material: Fiberglass Fiberglass Fiberglass <br /> Heieht from Tank Top to Top of 1212" 12." i <br /> ,. <br /> Highest Pipin,-Penetration: <br /> Height from Tank Top to Lowest <br /> Electrical Penetration: 14 13" 13 <br /> Condition of sump prior to testing: Good Good _ Good <br /> Portion of Sump'rested' 2"above piping 2"above piping 2'*above piping <br /> Does turbine shut down when _ <br /> sump sensor detects liquid(both ❑Yes Q No ®NA Q Yes D No®NA ❑Yes Q No®NA <br /> product and water)?' <br /> Turbine shutdown response time NIA N/A NIA <br /> Is system programmed for fail-safeYes es Q No 0 NA Q Yes❑No O NA ❑Yes❑No®NA <br /> shutdown?' <br /> i Was fail-safe verified to be O yes Q No ®NA Q Yes O No®NA ❑Yes❑No®NA <br /> operational?* _....... __.... <br /> ...___. <br /> !' Wait time between Applying <br /> l' pressure/vacuum/water and starting 30 minutes 30 minutes 30 minutes <br /> test: <br /> Test Start Time: 9:24 am 9:03 am 9:24 am <br /> Initial Beading(Rj): 1.6720 6,8713 1.8118 <br /> Test End Time: 9:39 am 9:18 am 9:39 am <br /> Final Reading(RF): y 1.6719 6.8709__.0 1.8113 - <br /> Test Duration: 15 min. - 15 min. 15 min. <br /> Change in Reading(Rt-R,) 0.0001 0.0004 0.0005 _ <br /> Pass/Fail Threshold or Criteria: +/.0,002" +1-0.002" +1-0.002" <br /> Test Result: Pass 0 rail O PIISS G Fail IK Pass Q Fail <br /> Was sensor removed for testing? ®Yes ❑No❑ NA ®Yes p No p NA ®Yes❑ No D NA <br /> Was sensor properly replaced and Z Yes❑No <br /> verified functional after testing? p D'�A i ®Yes[�No❑NA ®Yes❑No D NA f <br /> Comments—(include inhwinaiian on repairs+nade prior to testing, and recortamended,fc�llow-icp forlailedltests) <br /> "Sensor functionality was not conrirmed.This procedure is not part of the Secondary Containment testing scope of work". <br /> If the entire depth of the sump is not tested,specify how much was tested, If the answer to any of the questions indicated with an <br /> asterisk(")is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />