Laserfiche WebLink
NOV 14 2014 <br /> 7. UNDER-DISPENSER CONTAINMENT(UDC)TE NG <br /> I (est Method Developed By: p UDC Manufacturer ®industry Standard p Pr t 9 J71FOW [ <br /> _ ❑ Other(Speci6,) �A TH <br /> Test Method Used: ❑ Pressure ❑ Vacuum ®Hydrostatic <br /> ❑ Other(Spec&) <br /> Test Equipment Used: Incon Sump Tester Equipment Resolution: +/-0.002" T� <br /> UDC# 1/2 UDC#314 UI)C#516 UDC#718 <br /> UDC Manufacturer: Western Fiberglass Western Fiberglass Western Fiberglass t4cste n fiberglass <br /> _UDC Material: t Fiberglass Fiber Lass Fiberglass Fiberglass <br /> UDC De th — 31" 31 31" 31" <br /> Height from UDC Bottom to Top � � 5„ <br /> of Highest Piping Penetration: 5" 5" 5" <br /> i Height from UDC Bottom to1`Y. <br /> 12" I 2 12" <br /> s Lowest Electrical Penetration: <br /> Condition of UDC prior to Good Good Good Good <br /> testing: <br /> Portion of UDC Tested 2"above piping 2"above piping 2"above piping <br /> �2"above piping <br /> Does turbine shut down when <br /> UDC sensor detects liquid(both ❑ Yes p No ®NA ❑Yes❑No ®NA p Yes❑No ®NA ❑Yes p No ®NA <br /> V <br /> product and water)?* <br /> I Turbine shutdown response time N/A N/A NIA N/A <br /> Is system programmed for fail- <br /> safe shutdown?' ❑Yes❑No ®NA p Yes p No ®NA p Yes 171 No ®NA ❑Yes ElNo ®NA <br /> Was tail-safe verified to be <br /> operational?' ❑Yes p No ®NA ❑ Yes❑No ®NA ❑ Yes❑No ®NA p Yes❑No ®NA <br /> Wait time between applying <br /> pressureivacuum/water and 30 minutes 30 minutes 30 minutes 30 minutes <br /> s <br /> starting test _ <br /> Test Start Time: 11:03 am 11:03 am 11:03 am 12:32_em <br /> Initial Reading(R,): 4.3066 0.5398 2.9006 1.3253 <br /> Test End Time: 11:18 am 1]:18 am 11:18 am _ 12�tn <br /> Final Reading•�(Rf.): 4.3064 0.5396 2.9005 1.3256 <br /> Test Duration: 15 min. 15 min. 15 min. 15 min. <br /> Change in Readin (RF-Rt : - 0.0002 0.0002 0.0001 0.0003 <br /> Pass/Fail Threshold or Criteria: +/-0.002" +/-0.002" +/-OA02" +/-0.002" <br /> Test Result: ® Pass 0 Fail El Pass 0 Fail © Pass 0 Fail © Pass 0 Fail <br /> Was sensor removed for testing? ®Yes p No❑N_A _®Yes❑No ❑NA ®Yes i]No p NA ®Yes p No❑NA <br /> Was sensor properly replaced and <br /> verified functional after testinn? ®Yes p No p NA ®Yes❑No❑NA ®Yes❑No p NA ®Yes p No❑NA M <br /> Comments—(include information on repairs made prior to lesting, and,recommended follow-upfor failed testa) <br /> "Sensor functionality was not confirmed.This procedure is not part of the Secondary Containment testing scope of work". <br /> If the entire depth of the UDC is not tested,specify how much was tested. If the answer to any ofthe questions indicated with an <br /> asterisk(")is"NO"or"NA".the entire UDC must be tested. (See SWRCB LG-160) <br />