Laserfiche WebLink
aunt '�y S _� <br /> 0 <br /> NOV 14 2014 <br /> H <br /> 7. UNDER-DISPENSER CONTAINMENT(UDC)TESTING <br /> Test Method Developed By: p UDC Manufacturer ® Industry Standard Q Professional Cnaineer <br /> ❑ Other(,Specify,) <br /> Test Method Used: p Pressure ❑ Vacuum ®Hydrostatic <br /> ❑ Other(.SpectA-) <br /> Test Equipment Used: Incon Sump Tester 1-cluipment Resolution: 0.002" 4 <br /> UDC 4 17/18 UDC 4 19/20 <br /> UDC Manufacturer: Western Fiberglass Western Fiberglass <br /> IUDC Material: Fiber lass Fiber•lass _ �� <br /> UDC Depth: 31" 31" <br /> Height from UDC Bottom to Top _ ----r- ----------- <br /> ! of Highest Piping Penetration: 5.. 6,. i —.....-.___._... <br /> Height from UDC Bottom to 10" 10" <br /> Lowest Electrical Penetration: <br /> Condition of UDC prior to Good Good —_ <br /> -testing: <br /> Portion of UDC Tested 2"above piping 2"above ipt"na <br /> Does turbine shut down when <br /> UDC sensor detects liquid(both ❑Yes❑No ®NA ❑Yes p No ®NA <br /> product and water)?` _ <br /> I Turbine shutdown response time N/A W N/A <br /> Is system programmed for fail- <br /> safe shutdown? Cl Yes p No ®NA Q Yes[3No ®NA <br /> Waste fail-safe verified to be _ <br /> o erational?� ❑ Yes❑No ®NA ❑Yes❑Na ®NA <br /> Wait time between applying <br /> pressuretvacuum/water and 30 minutes 30 minutes <br /> starting test <br /> Test Start Time: 10:36 am 10:36 atn <br /> Initial Reading(Rt): 1.0479 3.6528 <br /> Test End Time: 10:51 am 10:51 am <br /> Final Reading(R,t): 1.0478 3.6532 <br /> '!'est Duration: --_ 15 min. 15 min. <br /> Change in Reading(Rt;-Rj): 0.0001 0.0004 <br /> Pass/Fail Threshold or Criteria: +/-0.002" +/-0.002" <br /> Test Result: 0 Pass ❑ Fail ® Pass ❑Fail <br /> Was sensor removed for testing? ®Yes❑No Q NA ®Yes❑No DNA <br /> Was sensor properly replaced and Eyes❑ No❑NA Z Yes Q No❑NA <br /> verified functional after testing? 9 <br /> Cominents—(include information on repairs made prior to testin,:;, and recotttrttended follow-up for failed tests) <br /> "Sensor functionality was not confirmed.This procedure is not part of the Secondary Containment testing scope of work". <br /> If the entire depth of the UDC is not tested,specify how much was tested. If the answer to aqU of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire UDC must be tested. (See SWRCB LG-160) <br />