My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2013 - 2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
1987
>
2300 - Underground Storage Tank Program
>
PR0517565
>
COMPLIANCE INFO 2013 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:19:31 AM
Creation date
2/28/2019 4:45:23 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013 - 2018
RECORD_ID
PR0517565
PE
2361
FACILITY_ID
FA0013503
FACILITY_NAME
SAFEWAY FUEL CENTER #2600
STREET_NUMBER
1987
Direction
W
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
1987 W ELEVENTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
347
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NOV 14 2014 <br /> 8. FILL RISER CONTAINMENT SUMP TESTING <br /> Facility is Not Equipped With Fill Riser Containment Sumps p _ _ "ALEH <br /> Fill Riser Containment Sumps are Present,but were Not Tested p =' <br /> Test Method Developed By: O Sump ManufaCttrrer industry Standardy p Professional E?ngineer <br /> i 0 Other(Specify) <br /> Test Method Used: 'T O Pressure `_._..__.._..—p`vacuum ® Hydrostatic <br /> O Other(Specify) <br /> .........._ <br /> rest Equipment Used: Incon Sump Tester Equipment Resolution: +/-0.002" <br /> Hill Sump#87 Fill Sump#91 Fill Sump#Diesel <br /> Sump Diameter; 42- <br /> 42" 42' <br /> Sump Depth: — 72" T— 72" i 72" <br /> Height from Tank Top to Top of 18" 18" 24" <br /> Highest Piping Penetration: <br /> I Height from Tank Top to Lowest �1" 21" 22„ <br /> Electrical Penetration: 1 <br /> Condition of sump prior to Good Good _ Good <br /> testing: <br /> Portion of Sump Tested 2"above piping 2"above pipima 2"above PiRing <br /> Sump Material: Fiberglass Fiberglass Fiberglass <br /> Wait time between applying <br /> pressurelvacuum/water and 30 minutes 30 minutes 30 minutes <br /> starting test: <br /> Test Start Time: 8:39 am 9:03 am 8:39 am <br /> Initial Reading(Rr): 4.7260 7.1443 4.0033 <br /> Test End Time: 8:54 am _ 9:18 am 8:54 am <br /> Final Reading(R.r): 4,7259 7.1442 4.0029 _ <br /> Test Duration: 15 min. 15 min. 15 min. <br /> Change in Reading(Rr-Rj): 0.0001 0.0001 0.0004 <br /> Pass/Fail Threshold or Criteria: +/-0.002" +/-0.002" +/-0.002" <br /> Test Result: i I@ Pass 0 Fail 21 Pass 0 Fail I@ Pass ❑Fail <br /> Is there a sensor in the sump? ®Yes p No ®Yes O No N Yes O No <br /> Does the sensor alarm when <br /> either product or water is © Yes❑No N NA O Yes p No®NA [I Yes p No N NA <br /> detected? <br /> Was sensor removed for testing? N Yes[]No❑NA N Yes p No[3 NA N Yes O No❑NA <br /> Was sensor properly replaced and NYes p No p NA ®Yes O No O NA ®Yes O No p NA <br /> verified functional after testing? <br /> Comments—(include informalion on repairs made prior to leslinm and reconvnended,ffyllvir-up for firiled tests) _ <br /> Sensor functionality was not confirmed.This procedure is not part of the Secondary Containment testing scope of work <br />
The URL can be used to link to this page
Your browser does not support the video tag.