My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0012562
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
440
>
2900 - Site Mitigation Program
>
PR0536618
>
ARCHIVED REPORTS XR0012562
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2019 10:37:51 AM
Creation date
3/4/2019 8:02:28 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012562
RECORD_ID
PR0536618
PE
2960
FACILITY_ID
FA0021026
FACILITY_NAME
STOCKTON CHARTER WAY COMMON PLUME
STREET_NUMBER
440
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16503003
CURRENT_STATUS
01
SITE_LOCATION
440 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
639
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
H' In <br /> IF9 0 <br /> R/ <br /> MR <br /> - <br /> M, <br /> Fyj <br /> a. <br /> Texaco Refining and Marketing Inc. <br /> March 30, 1989 <br /> 202/150-4150 <br /> local procedures which require that a site Specific Safety Plan <br /> be developed and implemented. <br /> The purpose of -Chis. site Specific Safety Plan is to provide <br /> field personnel and subcontractors with an understanding of the <br /> potential chemical and physical hazards that exist or may arise <br /> while the following tasks of this project are performed: <br /> 0 Investigatory Soil Boring and Sampling <br /> 0 Monitoring Well Installation <br /> To ensure the well-being of all field personnel and the <br /> community surrounding this facility, project staff and approved <br /> subcontractors must adhere to the policies and procedures <br /> established herein. Accordingly, all personnel assigned to this <br /> project must read this site safety plan and sign the Certifi- <br /> cation and Acknowledgment Statement (Appendix A) to certify that <br /> they have read, understood and agreed to abide by its provisions. <br /> PROPOSED DATES OF SITE WORK <br /> April, 1989. <br /> CONTAMINANTS <br /> Gasoline hydrocarbons (including benzene, toluene, ethyl- <br /> benzene, and xylene) . <br /> COPY <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.