My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE FILE 2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
1045
>
3500 - Local Oversight Program
>
PR0544231
>
SITE INFORMATION AND CORRESPONDENCE FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2019 2:38:20 PM
Creation date
3/6/2019 1:37:55 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 2
RECORD_ID
PR0544231
PE
3526
FACILITY_ID
FA0023968
FACILITY_NAME
NOMELLINI CONSTRUCTION CO
STREET_NUMBER
1045
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16323040
CURRENT_STATUS
02
SITE_LOCATION
1045 W CHARTER WAY
P_LOCATION
01
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
170
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
d <br /> Dante John Nomellini -2- 9/3/09 <br /> 552 <br /> COST PRE=APPROVAL BREAKDOWN <br /> Classification UNITS QUANITITY UNIT COST COST <br /> PERMITTING/PRE-FIELD <br /> ACTIVITIES <br /> Planning & Coordination Project him 20 $120.00 <br /> Manager $,2400.00 <br /> Air Permit ea 1 $35D0.00 $3,500.00 <br /> Discharge Permits ea 1 $1500.00 $15500.00 <br /> Electrical power hook up with unit 1 $6000.00 <br /> meter $6,000.00 <br /> Utility Clearance hrs 1 $ 150.00 $1 ,502.00 <br /> TRENCHING/PIPING AND <br /> ENCLOSURE INSTALLATION <br /> Treching/Plping Installation Well unit 1 <br /> Box Installaion $6,000.00 - $6,000.00 <br /> Piping and Supplies unit 1 <br /> $600.00 $800.00 <br /> Re-surfacing unit 1 $1 ,0110,00 $10000400 _ <br /> Fenced Enclosure Installation unit 1 $2,500.00 $2 500.00 - <br /> Concrete Pad-and Secondary unit 1 $3,000.00 $31000X0 <br /> Containment Installation - <br /> Debris Disposal - unit t $650.00 $650.00 <br /> 3-24" Traffic Trac rated Remediation unit 1 $1 ,000.00 $1 ,000.00 <br /> Well Boxes <br /> SYSTEM INSTALLATION . <br /> Dual Phase Extraction System <br /> Air Stripper Pre Treatment - ea 1 <br /> - $52,839.00 $52,839.00 <br /> System <br /> Carbon Vessels ea 1 $30,247.50 $30,247.50 <br /> Chemical Pre-Treatment System ea 1 $15,868,50 - $15,966.50 <br /> Pre-Treabnent Sampling Event ea 1 $5,000.00 $5,000.00 <br /> for Water Chemistry Evaluallon <br /> Field Vehicle da 1 $60.00 <br /> $60.00 <br /> Piping/Miscellaneous Supplies unit 1 $1 ,000.00 <br /> $1 ,000.00 <br /> SYSTEM STARTUP AND <br /> CONFIGURATION (One week <br /> period) <br /> Project Scientist hrs 4 $90.00 $360.00 <br /> Technician hrs 30 $70.00 <br /> $2,100.00 <br /> Support Vehicle day 5 $60.00 $300.01) <br /> PID day 5 $100.00 $500.00 <br /> Misc Supplies day 5 $25.00 $125.00 <br /> Tedlar Bas ea 11) <br /> $15.00 $150.00 <br /> - Laborato Anal sis ea 50- $135.00 $6,750.00 <br /> Laboratory Shipping ea 3 $20.00 $100.00 <br /> $144,540,00 <br /> Calforrria�hvironmeitfalPralecfion Agency <br /> a <br /> ea R ry�f�Poe,. <br />
The URL can be used to link to this page
Your browser does not support the video tag.