My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
1145
>
2900 - Site Mitigation Program
>
PR0009298
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2019 4:57:52 PM
Creation date
3/6/2019 3:16:31 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0009298
PE
2960
FACILITY_ID
FA0004672
FACILITY_NAME
INDEPENDENT TRUCKING
STREET_NUMBER
1145
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16323012
CURRENT_STATUS
01
SITE_LOCATION
1145 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
标签
EHD - Public
该页面上没有批注。
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
VL GENERAL HEALTH AND SAFETY REQUIREMENTS <br /> A. Training <br /> All contractor and subcontractor field personnel assigned to this operation will <br /> have completed applicable Health and Safety Training and are current on their <br /> refresher course certifications. <br /> B. Medical <br /> All contractor and subcontractor field personnel assigned to this operation will <br /> have completed a comprehensive medical examination within the last 12 months. <br /> C. Field Supervision <br /> All field activities will be supervised by a Field Supervisor having training and <br /> experience commensurate with the activity. Field Supervisors have the authority <br /> and responsibility to correct any unsafe act or condition during the course of <br /> operations. <br /> D. Safe Work Practices <br /> All contractor and subcontract personnel assigned to the operation will follow safe <br /> work practices including good personal hygiene, reporting all injuries, following <br /> instructions, inspecting equipment before use, anticipating hazards, utilizing the <br /> buddy system, etc. <br /> E. Job Safety Review <br /> Field Supervisors will conduct daily pre-operations safety meetings with all <br /> contractor and subcontractor personnel. <br /> VII. SPECIFIC HEALTH AND SAFETY REQUIREMENTS <br /> A. Site Control <br /> Work zones and other site control measures will be established as needed for the <br /> operation, depending on chemical hazards, work location and other requirements. <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.