My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0001002
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
1145
>
3500 - Local Oversight Program
>
PR0544235
>
ARCHIVED REPORTS XR0001002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2019 5:38:29 PM
Creation date
3/6/2019 3:31:19 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0001002
RECORD_ID
PR0544235
PE
3529
FACILITY_ID
FA0004672
FACILITY_NAME
INDEPENDENT TRUCKING
STREET_NUMBER
1145
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16323012
CURRENT_STATUS
02
SITE_LOCATION
1145 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
to the site of the removed leach field Locations of that work <br /> are shown on GATE VI; more complete details are given in prior <br /> reports. Refer to .TABLE I for a summary of laboratory analyzes <br /> of the work done. <br /> November, 1993 - Two hand-auger samples were taken 5' & 10 ' west <br /> of the second chamber of the concrete septic tank, (which is <br /> still in place, ) to depths of about 12' bgl The samples were <br /> analyzed for kerosene, diesel, & motor oil; the east sample was <br /> below detection limits, but the west sample measured 20 mg/kg of <br /> TEPH The excavation was filled with clean material; we do not <br /> have details of that work <br /> Se t tuber 30 1994 - A 1, 000 gallon waste oil tank was removed <br /> from a site adjacent to the wash rack by Jim Thorpe Oil, Inc. ; <br /> it' s location is shown on PLATE VII . Soil samples were taken <br /> from the excavation & the spoil pile, and analyzed for BTEX, <br /> TPHG, TEPH, EPA 8010 , EPA 8270, & CAM-TTLC. 10 metals. The <br /> results of those analyzes are summarized on TABLES II . III , IV, & <br /> V The excavation was filled with clean material, and the spoil <br /> pile moved to a site adjacent to the diesel tanks_ Laboratory <br /> worksheets were included with the November workplan. <br /> October 4 1994 - Jim Thorpe Oil, Inc. removed a 10 ,000 gallon, a <br /> 5, 000 gallon, and a 3, 000 gallon UST which had contained diesel <br /> fuel; refer to PLATE VIII for their locations. Soil samples were <br /> taken from beneath the tanks & the fill line connecting the two <br /> sets, as well as along the product line leading to the northeast <br /> end of the shop building. Details of that work has been <br /> discussed in detail in prior reports. Results of laboratory <br /> analyzes are summarized on TABLE VI_ <br /> November 7 . 1994 - Wm. J. Hunter & Associates, (WJH, ) submitted a <br /> workplan to the CRWQCB for placing three (3) soil borings, (& <br /> converting one to a groundwater monitoring well, ) for the purpose <br /> of attempting to determine the source and extent of hydrocarbon <br /> contaminants found in the groundwater in the vicinity of the <br /> leach field. A copy of that workplan, (w/o exhibits, ) is <br /> included as EXHIBIT A. <br /> December 7 1994 - Jim Thorpe submitted a workplan to the San <br /> Joaquin County EHD proposing to overexcavate the site of the <br /> three diesel tanks, and take additional samples as required_ A <br /> copy of the workplan is included as EXHIBIT I7. <br /> December 9 1994 - The CRWQCB responded to the WJH workplan, <br /> stating that the proposed work was not sufficient, and required <br /> that a more thorough investigation be conducted A copy of that <br /> letter is included as EXHIBIT B. <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.