Laserfiche WebLink
Creo(ogfca(Teckakslnc. Page 2 <br /> Status Report <br /> Project No.507.2 <br /> November 21,2005 <br /> groundwater. He directed that a work plan for the bench scale pilot test be submitted for his <br /> review. GTI submitted our August 8, 2005 "Ozone Sparging SECOR Benchscale Test' work <br /> plan and subsequent addenda for RWQCB consideration. The RWQCB hasgranted approval <br /> for the bench scale test(BST) in their November 9, 2005 letter(copy attached). <br /> GTI will prepare a budget for the three (3) continuous sampling soil borings as proposed in <br /> our March 7, 2005 work plan. A separate budget will also be prepared for the BST as <br /> approved by the RWQCB and both will be submitted for your consideration. <br /> If you have any questions, please do not hesitate to call me at(209) 522-4119. <br /> Respectfully submitted, <br /> Joseph D. Angulo <br /> Project Geologist <br /> cc: Mike Infurna- SJC PHS/EHD <br /> Jim Barton- CRWQCB-CVR <br /> USTCFP <br />