Laserfiche WebLink
THERMAL AND MOISTURE PROTECTIONPART 1 - GENERAL1.1 SUBMITTALSA. SHOP DRAWINGS: INDICATE MATERIALS, FASTENING METHODS, RELEVANT FIELDDIMENSIONS, AND RELATIONSHIP TO ADJOINING CONSTRUCTION.1.2 QUALITY ASSURANCEA. INSTALLER QUALIFICATIONS: MINIMUM OF TWO YEARS EXPERIENCE ONCOMPARABLE COMPLETED PROJECTS. INSTALLER SHALL BE APPROVED BY THEPANEL MANUFACTURER.B. PRE-INSTALLATION CONFERENCE:1. ADMINISTER PRIOR TO STARTING THE WORK OF THIS SECTION.C. MOCK-UP:1. PROVIDE AN APPROXIMATE 100 SQUARE FOOT MOCK-UP OF THE IN-PLACE WORK IN A LOCATION AS SHOWN ON DRAWINGS.1.3 PRODUCTS1. WOOD PHENOLIC COMPOSITE PANEL (PNL-1 AND PNL-2); PROVIDED BY OWNERINSTALLED BY CONTRACTOR.2. THERMAL PHENOLIC FIBER COMPOSITE PANEL: (PNL-3); PROVIDED BY OWNERINSTALLED BY CONTRACTOR.1.4 ACCESSORIESA. ELASTOMERIC JOINT SEALANT: SINGLE-COMPONENT NEUTRAL-CURING SILICONEJOINT SEALANT COMPLYING WITH REQUIREMENTS IN DIVISION 07 SECTION "JOINTSEALANTS" FOR USE NT (NONTRAFFIC) AND FOR USES M, G, A, AND, ASAPPLICABLE TO JOINT SUBSTRATES INDICATED, O JOINT SUBSTRATES.B. FASTENERS:1. AS RECOMMENDED BY MANUFACTURER AND SUITABLE FORAPPLICATION.2. CONCEALED APPLICATIONS: HOT DIP GALVANIZED.3. EXPOSED APPLICATIONS: 18/8 STAINLESS STEEL; TRUSS HEAD 10 MMDIAMETER AS RECOMMENDED BY MANUFACTURER.C. FURRING CHANNELS: 1X4 INTERMEDIATE WOOD BATTENS, 1X6 AT VERTICAL JOINTS.D. APPLY 3 INCH EPDM RUBBER STRIPPING AT INTERMEDIATE BATTENS AND 5 INCHEPDM ON BATTENS AT JOINTS.E. CONCEALED PANEL CLIPS: MILL FINISHED ALUMINUM CLIPS. MINIMUM 1 INCHHIGH BY INCH THICK, LENGTHS AS REQUIRED.END OF SECTION 074243SECTION 074243 - COMPOSITE WALL PANELTHERMAL AND MOISTURE PROTECTION1.1 SUMMARYA.[ADHERED] [MECHANICALLY FASTENED] [LOOSELY LAID AND BALLASTED]EPDMMEMBRANE ROOFING SYSTEM.B. VAPOR RETARDER.C. ROOF INSULATION.1.2 SUBMITTALSA. PRODUCT DATA: FOR EACH TYPE OF PRODUCT INDICATED.B. SHOP DRAWINGS: FOR ROOFING SYSTEM. INCLUDE PLANS, ELEVATIONS,SECTIONS, DETAILS, AND ATTACHMENTS TO OTHER WORK.1. BASE FLASHINGS AND MEMBRANE TERMINATIONS.2. TAPERED INSULATION, INCLUDING SLOPES.3. INSULATION FASTENING PATTERNS.C. MANUFACTURER CERTIFICATES: SIGNED BY ROOFING MANUFACTURER CERTIFYINGTHAT ROOFING SYSTEM COMPLIES WITH REQUIREMENTS SPECIFIED IN"PERFORMANCE REQUIREMENTS" ARTICLE.1. SUBMIT EVIDENCE OF MEETING PERFORMANCE REQUIREMENTS.D. QUALIFICATION DATA: FOR INSTALLER AND MANUFACTURER.E. PRODUCT TEST REPORTS: BASED ON EVALUATION OF COMPREHENSIVE TESTSPERFORMED BY MANUFACTURER AND WITNESSED BY A QUALIFIED TESTING AGENCY,FOR COMPONENTS OF ROOFING SYSTEM.1.3 PERFORMANCE REQUIREMENTSA. ROOFING SYSTEM DESIGN: UPLIFT PRESSURES CALCULATED ACCORDING TOASCE/SEI 7.B. SOLAR REFLECTANCE INDEX: NOT LESS THAN 78.C. EXTERIOR FIRE-TEST EXPOSURE: CLASS A.1.4 MATERIALSA. EPDM MEMBRANE ROOFING: NON-REINFORCED, 60 MILS (1.5 MM) THICK, EXPOSEDFACE COLOR WHITE ON BLACK.B. SHEET FLASHING: 60-MIL- (1.5-MM-) THICK EPDM.C. ROOF INSULATION: PREFORMED ROOF INSULATION BOARDS MANUFACTURED ORAPPROVED BY EPDM ROOFING MANUFACTURER.1. TAPERED BOARDS: 1/4 INCH PER 12 INCHES (1:48).1.5 INSTALLATIONA. MEMBRANE ROOFING: FULLY ADHERED.B. SEAMS: TAPE.1.6 FIELD QUALITY CONTROLA. TESTING AGENCY: OWNER ENGAGED.END OF SECTION 075323SECTION 075323 - ETHYLENE-PROPYLENE-DIENE-MONOMER (EPDM) ROOFINGTHERMAL AND MOISTURE PROTECTION1.1 SUMMARYA. MECHANICALLY FASTENED MEMBRANE ROOFING SYSTEM.B. VAPOR RETARDER.C. ROOF INSULATION.1.2 SUBMITTALSA. PRODUCT DATA: FOR EACH TYPE OF PRODUCT INDICATED.B. SHOP DRAWINGS: FOR ROOFING SYSTEM. INCLUDE PLANS, ELEVATIONS,SECTIONS,DETAILS, AND ATTACHMENTS TO OTHER WORK.1. BASE FLASHINGS AND MEMBRANE TERMINATIONS.2. TAPERED INSULATION, INCLUDING SLOPES.3. INSULATION FASTENING PATTERNS.C. INSTALLER CERTIFICATES: SIGNED BY ROOFING SYSTEM MANUFACTURERCERTIFYING THAT INSTALLER IS APPROVED, AUTHORIZED, OR LICENSED BYMANUFACTURER TO INSTALL ROOFING SYSTEM.D. MANUFACTURER CERTIFICATES: SIGNED BY ROOFING MANUFACTURERCERTIFYING THAT ROOFING SYSTEM COMPLIES WITH REQUIREMENTS SPECIFIED IN"PERFORMANCE REQUIREMENTS" ARTICLE.1. SUBMIT EVIDENCE OF MEETING PERFORMANCE REQUIREMENTS.E. QUALIFICATION DATA: FOR INSTALLER AND MANUFACTURER.F. PRODUCT TEST REPORTS: BASED ON EVALUATION OF COMPREHENSIVE TESTSPERFORMED BY MANUFACTURER AND WITNESSED BY A QUALIFIED TESTINGAGENCY, FOR COMPONENTS OF ROOFING SYSTEM.G. WARRANTIES: SPECIAL WARRANTIES SPECIFIED IN THIS SECTION.1.3 PERFORMANCE REQUIREMENTSA. ROOFING SYSTEM DESIGN: UPLIFT PRESSURES CALCULATED ACCORDING TOASCE/SEI 7.B. SOLAR REFLECTANCE INDEX: NOT LESS THAN 78.1.4 EXTERIOR FIRE-TEST EXPOSURE: CLASS A.1.5 MATERIALSA. THERMOPLASTIC POLYOLEFIN ROOFING MEMBRANE: WHITE, FABRIC-REINFORCEDTHERMOPLASTIC SHEET, 60 MILS (1.5 MM) THICK.B. SHEET FLASHING: SAME AS TPO SHEET.C. ROOF INSULATION: PREFORMED ROOF INSULATION BOARDSMANUFACTURED OR APPROVED BY EPDM ROOFING MANUFACTURER.1. TAPERED BOARDS: 1/4 INCH PER 12 INCHES(1:48).1.6 INSTALLATIONA. ROOFING MEMBRANE: MECHANICALLY FASTENED.1. ATTACHMENT METHOD FOR MECHANICALLY FASTENED:[IN SPLICE][THROUGH MEMBRANE].1.7 FIELD QUALITY CONTROLA. TESTING AGENCY: OWNER ENGAGED.END OF SECTION 075423SECTION 075423 - THERMOPLASTIC POLYOLEFIN (TPO) ROOFINGTHERMAL AND MOISTURE PROTECTION1.1 MATERIALSA. SHEET METALS:1. COPPER SHEET: MILL FINISH.2. STAINLESS-STEEL SHEET, TYPE 304: 4 (DIRECTIONAL SATIN) FINISH WITHSMOOTH, FLAT SURFACE.3. METALLIC-COATED STEEL SHEET: PROVIDE ZINC-COATED (GALVANIZED) STEELSHEET ACCORDING TO ASTM A 653/A 653M, G90 (Z275) COATING DESIGNATION;PREPAINTED BY COIL-COATING PROCESS TO COMPLY WITH ASTM A 755/A 755M.a. SURFACE: MANUFACTURER'S STANDARD CLEAR ACRYLICCOATING ON BOTH SIDES.b. COIL-COATED FINISH: TWO-COAT FLUOROPOLYMER.B. UNDERLAYMENT: FELTS.1.2 PRODUCTSA. FORMED LOW-SLOPE ROOF FABRICATIONS: INCLUDING COPINGS, ROOFEXPANSION-JOINT COVERS, COUNTERFLASHING, FLASHING RECEIVERS,ROOF-PENETRATION FLASHING AND ROOF-DRAIN FLASHING.B. FORMED WALL FABRICATIONS: INCLUDING THROUGH-WALL FLASHING, OPENINGFLASHINGS IN FRAME CONSTRUCTION, AND WALL EXPANSION-JOINT COVER.C. MISCELLANEOUS FORMED FABRICATIONS: INCLUDING EQUIPMENT SUPPORTFLASHING.END OF SECTION 076200SECTION 076200 - SHEET METAL FLASHING AND TRIMTHERMAL AND MOISTURE PROTECTION1.1 PRODUCTSA. ROOF CURBS: INSULATED.1. HEIGHT: MINIMUM 12 INCHES (300 MM) ABOVE ROOFING SURFACE UNLESSOTHERWISE INDICATED.2. NAILER: FACTORY-INSTALLED WOOD NAILER ALONG TOP FLANGE OF CURB,CONTINUOUS AROUND CURB PERIMETER.B. EQUIPMENT SUPPORTS: RAIL TYPE.1. HEIGHT: MINIMUM 12 INCHES (300 MM) ABOVE ROOFING SURFACE UNLESSOTHERWISE INDICATED.C. DUCT SUPPORTS: EXTRUDED ALUMINUM, URETHANE INSULATED.D. PIPE PORTALS: FLASHING TYPE, FORMED ALUMINUM WITH EPDM CAPS.E. PREFORMED FLASHING SLEEVES: EXHAUST VENT FLASHING AND VENT STACKFLASHING FABRICATED FROM ALUMINUM SHEET.END OF SECTION 077200SECTION 077200 - ROOF ACCESSORIESTHERMAL AND MOISTURE PROTECTION1.1 SUBMITTALSA. PRODUCT DATA: FOR EACH TYPE OF PRODUCT INDICATED.1.2 QUALITY ASSURANCEA. INSTALLER QUALIFICATIONS: AN FM GLOBAL-APPROVED FIRESTOP CONTRACTOROR A UL-QUALIFIED FIRESTOP CONTRACTOR.B. FIRE-TEST-RESPONSE CHARACTERISTICS: TESTED PER ASTM E 814 BY QUALIFIEDTESTING AND INSPECTING AGENCY.1.3 PENETRATION FIRESTOPPINGA. PENETRATIONS IN FIRE-RESISTANCE-RATED WALLS: F-RATINGS PER ASTM E 814ORUL 1479.B. PENETRATIONS IN HORIZONTAL ASSEMBLIES: F- AND T-RATINGS PER ASTM E 814OR UL 1479.C. PENETRATIONS IN SMOKE BARRIERS: L-RATINGS PER UL 1479.D. W-RATINGS: PER UL 1479.E. VOC CONTENT OF INTERIOR SEALANTS: PROVIDE INTERIOR SEALANTS ANDSEALANT PRIMERS THAT COMPLY WITH THE FOLLOWING LIMITS FOR VOC CONTENTWHEN CALCULATED ACCORDING TO 40 CFR 59, SUBPART D (EPA METHOD 24):1. SEALANTS: 250 G/L.2. SEALANT PRIMERS FOR NONPOROUS SUBSTRATES: 250 G/L.3. SEALANT PRIMERS FOR POROUS SUBSTRATES: 775 G/L.1.4 INSTALLATIONA. IDENTIFICATION: PREPRINTED METAL OR PLASTIC LABELS, PERMANENTLYATTACHED.1.5 FIELD QUALITY CONTROLA. INSPECTION OF INSTALLED FIRESTOP SYSTEMS: BY OWNER-ENGAGED AGENCYACCORDING TO ASTM E 2174 REQUIREMENTS.END OF SECTION 078413SECTION 078413 - PENETRATION FIRESTOPPINGTHERMAL AND MOISTURE PROTECTION1.1 SUMMARYA. FIRE-RESISTIVE JOINT SYSTEMS FOR THE FOLLOWING:1. JOINTS IN OR BETWEEN FIRE-RESISTANCE-RATED CONSTRUCTIONS.2. JOINTS AT EXTERIOR CURTAIN-WALL/FLOOR INTERSECTIONS.3. JOINTS IN SMOKE BARRIERS.1.2 PERFORMANCE REQUIREMENTSA. FIRE-RESISTANCE RATINGS OF JOINT SYSTEMS IN AND BETWEENFIRE-RESISTANCE-RATED CONSTRUCTIONS: EQUALING OR EXCEEDING THEFIRE-RESISTANCE RATINGS OF CONSTRUCTION THAT THEY JOIN, [AND WITHMOVEMENT CAPABILITIES INDICATED ] AS DETERMINED BY UL 2079.1.3 SUBMITTALSA. PRODUCT DATA: FOR EACH TYPE OF PRODUCT INDICATED.1.4 QUALITY ASSURANCEA. FIRE-TEST-RESPONSE CHARACTERISTICS: TESTED BY QUALIFIED TESTINGAND INSPECTING AGENCY.1.5 FIRE-RESISTIVE JOINT SYSTEMSA. DESIGNATION SYSTEM FOR JOINTS IN OR BETWEEN FIRE-RESISTANCE-RATEDCONSTRUCTIONS: ALPHANUMERIC SYSTEMS LISTED IN UL'S "FIRE RESISTANCEDIRECTORY" UNDER PRODUCT CATEGORY XHBN.B. JOINTS IN OR BETWEEN FIRE-RESISTANCE-RATED CONSTRUCTION: EQUAL TOOR EXCEEDING THE FIRE-RESISTANCE RATING OF CONSTRUCTION THEY WILL JOIN.C. JOINTS AT EXTERIOR CURTAIN-WALL/FLOOR INTERSECTIONS: EQUAL TO OREXCEEDING THE FIRE-RESISTANCE RATING OF THE FLOOR ASSEMBLY.D. JOINTS IN SMOKE BARRIERS:1. L-RATING: NOT EXCEEDING 5.0 CFM/FT (0.00775 CU. M/S X M) OF JOINTAT 0.30 INCH WG (74.7 PA) AT BOTH AMBIENT AND ELEVATEDTEMPERATURES.E. EXPOSED FIRE-RESISTIVE JOINT SYSTEMS: PROVIDE PRODUCTS WITHFLAME-SPREAD AND SMOKE-DEVELOPED INDEXES OF LESS THAN 25 AND 450,RESPECTIVELY, AS DETERMINED PER ASTM E 84.F. VOC CONTENT: FIRE-RESISTIVE JOINT SYSTEM SEALANTS SHALL COMPLY WITHTHE FOLLOWING LIMITS FOR VOC CONTENT WHEN CALCULATED ACCORDING TO40 CFR 59, SUBPART D (EPA METHOD 24):1. ARCHITECTURAL SEALANTS: 250 G/L.2. SEALANT PRIMERS FOR NONPOROUS SUBSTRATES: 250 G/L.G. SEALANT PRIMERS FOR POROUS SUBSTRATES: 775 G/L.H. ACCESSORIES: FORMING MATERIALS AND OTHER COMPONENTS NEEDED TOINSTALL FILL MATERIALS AND MAINTAIN RATINGS REQUIRED.END OF SECTION 078446SECTION 078446 - FIRE-RESISTIVE JOINT SYSTEMSTHERMAL AND MOISTURE PROTECTION1.1 MATERIALSA. VOC CONTENT OF INTERIOR SEALANTS: PROVIDE INTERIOR SEALANTS ANDSEALANT PRIMERS THAT COMPLY WITH THE FOLLOWING LIMITS FOR VOC CONTENTWHEN CALCULATED ACCORDING TO 40 CFR 59, SUBPART D (EPA METHOD 24):1. SEALANTS: 250 G/L.2. SEALANT PRIMERS FOR NONPOROUS SUBSTRATES: 250 G/L.3. SEALANT PRIMERS FOR POROUS SUBSTRATES: 775 G/L.B. SUITABILITY FOR CONTACT WITH FOOD: WHERE SEALANTS ARE INDICATED FORJOINTS THAT WILL COME IN REPEATED CONTACT WITH FOOD, PROVIDE PRODUCTSTHAT COMPLY WITH 21 CFR 177.2600.C. ELASTOMERIC JOINT SEALANTS: LIQUID APPLIED, CHEMICALLY CURING;ASTM C 920.1. MULTICOMPONENT NONSAG NEUTRAL-CURING SILICONE SEALANT ES-1.2. SINGLE-COMPONENT MILDEW-RESISTANT NEUTRAL-CURING SILICONE SEALANTES-2.3. SINGLE-COMPONENT MILDEW-RESISTANT ACID-CURING SILICONE SEALANTES-3.4. SINGLE-COMPONENT MILDEW-RESISTANT ACID-CURING RTV SILICONE SEALANTES-4.5. MULTICOMPONENT NONSAG POLYUREA SEALANT ES-5.6. MULTICOMPONENT NONSAG POLYUREA FILLER ES-6.D. LATEX SEALANT LS-1: COMPLY WITH ASTM C 834, TYPE P, GRADE NF.E. JOINT-SEALANT BACKING:1.2 JOINT-SEALANT SCHEDULEA. JOINT-SEALANT APPLICATION JS-1: EXTERIOR HORIZONTAL NONTRAFFIC ANDTRAFFIC ISOLATION AND CONTRACTION JOINTS IN CAST-IN-PLACE CONCRETESLABS.1. JOINT SEALANT: ES-5.B. JOINT-SEALANT APPLICATION JS-2: EXTERIOR PERIMETER JOINTS BETWEEN WALLAND FRAMES OF DOORS AND WINDOWS.1. JOINT SEALANT: ES-1.C. JOINT-SEALANT APPLICATION JS-3: EXTERIOR CONTROL AND EXPANSION JOINTSINHORIZONTAL TRAFFIC SURFACES OF BRICK PAVERS, CERAMIC TILE, STONE PAVINGUNITS, CONCRETE TILE.1. JOINT SEALANT: MULTICOMPONENT POURABLE POLYSULFIDE SEALANT.2. JOINT-SEALANT COLOR: AS SELECTED BY ARCHITECT FROM MANUFACTURER'SFULL RANGE.D. JOINT-SEALANT APPLICATION JS-4: INTERIOR PERIMETER JOINTS OF EXTERIOROPENINGS.1. JOINT SEALANT: ES-3.E. JOINT-SEALANT APPLICATION JS-5: INTERIOR CERAMIC TILE EXPANSION, CONTROL,CONTRACTION, AND ISOLATION JOINTS IN HORIZONTAL TRAFFIC SURFACES.1. JOINT SEALANT: ES-3.2. JOINT-SEALANT COLOR: AS NOTED.F. JOINT-SEALANT APPLICATION JS-6: INTERIOR JOINTS BETWEEN PLUMBINGFIXTURES AND ADJOINING WALLS, FLOORS, AND COUNTERS.1. JOINT SEALANT: ES-3.2. JOINT-SEALANT COLOR: TRANSLUCENT.G. JOINT-SEALANT APPLICATION JS-7: VERTICAL JOINTS ON EXPOSED SURFACES OFINTERIOR PARTITIONS.1. JOINT SEALANT: ES-3.H. JOINT-SEALANT APPLICATION JS-8: PERIMETER JOINTS BETWEEN INTERIOR WALLSURFACES AND FRAMES OF INTERIOR DOORS, WINDOWS.1. JOINT SEALANT: ES-3.I. JOINT-SEALANT APPLICATION JS-9: HVAC JOINTS.1. JOINT SEALANT: ES-2.2. JOINT-SEALANT COLOR: ALUMINUM.J. JOINT-SEALANT APPLICATION JS-10: NON-POROUS MATERIAL TO NON-POROUSMATERIAL.1. JOINT SEALANT: ES-4.2. JOINT-SEALANT COLOR: CLEAR.END OF SECTION 079200SECTION 079200 - JOINT SEALANTS2401 UTAH AVENUE SOUTHSEATTLE, WASHINGTON 98134(206) 318-1575SHEET NUMBER:SHEET TITLE:SCALE: AS SHOWNSTORE #:PROFILE TYPE:PROJECT #:ISSUE DATE:PROGRAM MANAGER:STORE DESIGNER:CHECKED BY:PROJECT NAME:PROJECT ADDRESS:STARBUCKS COFFEECOMPANYRLEED AP:© 2017 STARBUCKS COFFEE COMPANY®111 Pacifica, Suite 280, Irvine, CA 92618P: 949.553.1117 F: 949.474.7056San FranciscoClevelandDenverIrvineARCHITECT OF RECORDARCHITECT STAMP2017MCG PROJ. MANAGER:MCG PROJ. SPECIALIST:MCG PROJECT #:THESE DRAWINGS AND SPECIFICATIONS ARECONFIDENTIAL AND SHALL REMAIN THE SOLEPROPERTY OF STARBUCKS CORPORATION,WHICH IS THE OWNER OF THE COPYRIGHT INTHIS WORK. THEY SHALL NOT BEREPRODUCED (IN WHOLE OR IN PART), SHAREDWITH THIRD PARTIES OR USED IN ANY MANNERON OTHER PROJECTS OR EXTENSIONS TO THISPROJECT WITHOUT THE PRIOR WRITTENCONSENT OF STARBUCKS CORPORATION.THESE DRAWINGS AND SPECIFICATIONS AREINTENDED TO EXPRESS DESIGN INTENT FOR APROTOTYPICAL STARBUCKS STORE (WHICH ISSUBJECT TO CHANGE AT ANYTIME) AND DONOT REFLECT ACTUAL SITE CONDITIONS.NEITHER PARTY SHALL HAVE ANY OBLIGATIONNOR LIABILITY TO THE OTHER (EXCEPT STATEDABOVE) UNTIL A WRITTEN AGREEMENT ISFULLY EXECUTED BY BOTH PARTIES.mcg architecture8/30/2017 5:43:26 PMJ:\2016 Projects\0-Starbucks\16514_SBX-6970_El Dorado & Fremont_Stockton_CA (NS-RELO)\02-Arch\3-CD\1-Revit Files\16514_SBX-6970_El Dorado & Fremont_Stockton.rvtG-001121295-04208/18/17ELDORADO &FREMONT510NELDORADOSTREETSTOCKTON, CA 95202SANJOAQUIN COUNTYCORE6970CH. LINM. DARMOKOOUTLINESPECIFICATIONSC. LEEG. MONTALVO16514Revision ScheduleRev Date By Description