My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
522
>
1600 - Food Program
>
PR0543471
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/27/2021 9:09:37 AM
Creation date
3/26/2019 1:52:49 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1600 - Food Program
File Section
WORK PLANS
RECORD_ID
PR0543471
PE
1624
FACILITY_ID
FA0024674
FACILITY_NAME
STARBUCKS #6970
STREET_NUMBER
522
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95202
CURRENT_STATUS
01
SITE_LOCATION
522 N EL DORADO ST
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\jcastaneda
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
416
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Case shown with <br />End Panel Removed <br />For Illustrative <br />Purposes Only <br />8 <br />INSTALLATION, CONT’D.: CASE STARTUP / CONFIRMING EVAPORATOR COIL FAN DISCHARGE <br />7. Turn On Power To Case <br /> <br />Caution! Before turning on main power switch, confirm that <br />no obstructions to fan blades or other moving parts exist. <br />Lift up deck pans to check for obstructions. <br />Power cord [located at case rear] should already be plugged <br />into outlet. See INSTALLATION section of this manual. <br />If there is no power cord, case is to be field-wired at rear. <br />See FIELD ACCESS [CASE REAR] section in this manual <br />for specifics on field wiring. <br />Access main power switch by removing front grille. <br />Main power switch is located on main electrical box, below <br />controller. See illustration at top-right. <br /> <br />8. Confirm Evaporator Coil Fan Discharge <br /> <br />When main power switch is turned on, refrigeration assembly <br />will energize (see CASE START-UP & REFRIGERATION <br />ASSEMBLY ACCESS section). <br />Evaporator coil fans should turn on. <br />From inside of case, check for discharge air from front baffle <br />(shown below), to confirm that fans are functioning properly. <br />Caution! Evaporator fans have protective fan guard to <br />prevent injury caused by spinning fan blades. Do not <br />remove fan guard! <br />Check that cold air is beginning to circulate. <br />When the case is in a start up mode or has been idle for a <br />long period of time, a 75 minute run time is required to fully <br />achieve set point temperatures. <br />See below illustration. <br />Note <br />Illustrations shown may not <br />reflect every feature or option <br />of your particular case. <br />Front Baffle <br />Deck Pan <br />Carel® Temperature <br />Controller <br />Main Power <br />Switch <br />Evaporator Fans <br />[Shown With <br />Fan Guard <br />Attached
The URL can be used to link to this page
Your browser does not support the video tag.