My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2013 - 2017
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CALIFORNIA
>
3212
>
2300 - Underground Storage Tank Program
>
PR0231035
>
COMPLIANCE INFO 2013 - 2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2019 1:14:19 PM
Creation date
3/28/2019 10:48:33 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013 - 2017
RECORD_ID
PR0231035
PE
2361
FACILITY_ID
FA0006773
FACILITY_NAME
ARCO 02186
STREET_NUMBER
3212
Direction
N
STREET_NAME
CALIFORNIA
STREET_TYPE
ST
City
STOCKTON
Zip
95204
APN
12532001
CURRENT_STATUS
01
SITE_LOCATION
3212 N CALIFORNIA ST
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
430
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page 5 of 8 <br /> 7. UNDER-DISPENSER CONTAINMENT DC TESTING <br /> Test Method Developed By: ❑ UDC Manufacturer ® Industry Standard ❑ Professional Engineer <br /> ❑ Other(Spec) <br /> Test Method Used: ❑ Pressure ❑ Vacuum ® Hydrostatic <br /> ❑ Other(Spec) <br /> Test Equipment Used: INCON SUMP TESTER Equipment Resolution:+/-0.002" <br /> UDC# 1/2 UDC#3/4 UDC#5/6 UDC#7/8 <br /> UDC Manufacturer: UNKNOWN UNKNOWN UNKNOWN UNKNOWN <br /> UDC Material: FIBERGLASS FIBERGLASS FIBERGLASS FIBERGLASS <br /> UDC Depth: 29" 29" 29" 29" <br /> Height from UDC Bottom to Top 9" 9" 9" 9" <br /> of Highest Piping Penetration: <br /> Height from UDC Bottom to 5" 5" 5" 5" <br /> Lowest Electrical Penetration: <br /> Condition of UDC prior to DRY DRY DRY DRY <br /> testing: <br /> Portion of UDC Tested ABOVE ABOVE ABOVE ABOVE <br /> PENETRATIONS PENETRATIONS PENETRATIONS PENETRATIONS <br /> Does turbine shut down when <br /> UDC sensor detects liquid(both [:]Yes ❑No ®NA ❑)cs ❑No ®NA ❑Yes ❑No ®NA ❑Yes ❑No ®NA <br /> product and water?* <br /> Turbine shutdown response time N/A N/A N/A NIA <br /> Is system programmed for fail- ❑yes ❑No ®NA ❑Yes ❑No ®NA ❑Yes ❑No ®NA ❑Yes ❑No ®NA <br /> safe shutdown?* <br /> Was fail-safe verified to be ❑Yes [:]No ®NA ❑Yes ❑No ®NA ❑Yes [-]No ®NA ❑Yes ❑No ®NA <br /> operational?* <br /> Wait time between applying <br /> pressure/vacuum/water and 10 MIN 10 MIN 10 MIN 10 M I N <br /> starting test <br /> Test Start Time: 8:52 AM 8:52 AM 8:52 AM 8:52 AM <br /> Initial Reading(Ri): 5.5594" 3.6004" 7.3977' 6.0241" <br /> Test End Time: 9:07 AM 9:07 AM 9:07 AM 9:07 AM <br /> Final Reading(RF): 5.5594" 3.6003" 7.3976" 6.0242" <br /> Test Duration: 15 MIN 15 MIN 15 MIN 15 MIN <br /> Change in Reading(RF-R,): 0.0000" -0.00011, -0.00011, 0.0001" <br /> Pass/Fail Threshold or Criteria: +/-0.002" +/-0.002" +/-0.002" +/-0.00211 <br /> Test Result: ® Pass ❑ Fail ®Pass ❑ Fail ® Pass ❑ Fail ®Pass ❑ Fail <br /> Was sensor removed for testing? ®Yes ❑N o ❑NA ®Yes [:]No ❑NA ®Yes [:]No ❑NA ®Yes [--]No ❑NA <br /> Was sensor properly replaced and <br /> verified functional after testing? ®Yes [-INo [:1NA ®Yes ❑No ❑NA ®Yes ❑No ❑NA ®Yes ElNo ElNA <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> ABOVE IS THE LAST OF TWO BACK TO BACK 15 MINUTE TESTS <br /> 1 If the entire depth of the UDC is not tested,specify how much was tested. If the answer to Illy of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire UDC must be tested. (See SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.