My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BESSEMER
>
1019
>
2800 - Aboveground Petroleum Storage Program
>
PR0515715
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2019 2:52:03 PM
Creation date
4/12/2019 10:43:59 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0515715
PE
2832
FACILITY_ID
FA0010328
FACILITY_NAME
MOUNTAIN VALLEY EXPRESS INC
STREET_NUMBER
1019
STREET_NAME
BESSEMER
STREET_TYPE
AVE
City
MANTECA
Zip
95337
APN
22104067
CURRENT_STATUS
01
SITE_LOCATION
1019 BESSEMER AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
FRuiz
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
15 February 2016 AdvancedGeo <br /> AGE Project No. 12-2181 Environmental <br /> Page 3 of 23 <br /> 1.4.6. Amendment Re-certification Time Frame <br /> The Coordinator oversees amendments to this Plan within six (6) months, whenever <br /> there is a change in Facility design, construction, operation, or maintenance that <br /> materially affects the Facility's spill potential. The revised Plan is evaluated for PE re- <br /> certification by Facility management and is conducted as necessary. <br /> 1.4.7. SPCCP Review Time Frame <br /> The Coordinator reviews this Plan on an annual basis. If necessary, the Coordinator <br /> updates this Plan to reflect any "administrative changes" that are applicable, such as <br /> personnel changes or revisions to contact information, such as phone numbers. <br /> Administrative changes must be documented in the Plan review log, included as Table 1 <br /> but do not have to be certified by a PE. <br /> 2.0. PLAN ADMINISTRATION AND FACILITY INFORMATION <br /> This section describes non-technical information for this Plan as approved by Facility <br /> management. <br /> 2.1. MANAGEMENT APPROVAL AND DESIGNATED PERSONNEL [40 CFR 112.7] <br /> Facility management is committed to preventing discharges of oil to navigable waters <br /> and the environment, and to maintaining the highest standards for SPCC through the <br /> implementation and regular review and amendment to this Plan. Additionally, Facility <br /> management has fully approved and committed the necessary resources to implement <br /> the measures described in this Plan. <br /> Administrative Facility management certification is provided on the page located prior to <br /> the table of contents of this Plan. The administrative Facility management certification <br /> page also indicates Facility personnel accountable for SPCC at the Facility <br /> 2.2. TECHNICAL PROFESSIONAL ENGINEER CERTIFICATION [40 CFR 112.3(d)] <br /> The technical PE certification is provided on the page located prior to the table of <br /> contents of this Plan. The PE is familiar with the requirements of Part 112 of Title 40 of <br /> the Code of Federal Regulations [40 CFR part 112] and has visited and examined the <br /> Facility or has supervised examination of the Facility by appropriately qualified <br /> personnel. The certifying PE attests that this Plan has been prepared in accordance <br /> with good engineering practice, including consideration of applicable industry standards <br />
The URL can be used to link to this page
Your browser does not support the video tag.