My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LINNE
>
8690
>
2900 - Site Mitigation Program
>
PR0009063
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2024 1:41:40 PM
Creation date
5/2/2019 1:23:01 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0009063
PE
2960
FACILITY_ID
FA0003785
FACILITY_NAME
PACIFIC TRIPLE E LTD
STREET_NUMBER
8690
Direction
W
STREET_NAME
LINNE
STREET_TYPE
RD
City
TRACY
Zip
95304
APN
253-210-180-00
CURRENT_STATUS
01
SITE_LOCATION
8690 W LINNE RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
187
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Installation of'XW-1 <br /> Health mid Snrcty Plat.AUGUST.1995 <br /> 080911%S.DOC <br /> C. Hard hats will be worn during all activities. <br /> d. Disposable clothing will be discarded to an appropriate storage container at the end of <br /> each day and disposed of properly at the completion of the job. <br /> 3.2 Respiratory/Eye/Ear Protection <br /> a. During drilling/excavation activities, ambient air and soil vapor will be monitored with an <br /> OVA. <br /> b. Site perimeter will also be monitored on 30 minute intervals. Monitoring frequency will be <br /> increased by the site manager if conditions approach 10 ppm with the OVA. <br /> C. Half face/full face respirators will be worn as warranted(see Section 5). <br /> d. Safety glasses will be worn during all activities. <br /> e. Appropriate hearing protection will be used during all drilling and excavation activities. <br /> 4.0 - PHYSICAL HAZARDS <br /> Safety hazards will be typical of those associated with construction activities involving heavy <br /> equipment(e.g., backhoe, excavator, drill rig, etc..). Possible hazards include underground/above <br /> grotud utilities,heat stress,noise, excavating and drilling. <br /> r <br /> 4.1 Underground/Above Ground Utilities <br /> The potential for contact with live underground/above ground utilities during the drilling is <br /> possible at the site. Underground Service Alert(USA)must be notified prior to field work <br /> to identify known utilities. Triple E Produce Facility will be responsible for identifying, <br /> deactivating, and removing underground/above ground utilities. Site personnel must be <br /> made aware of known utility locations. If an unknown utility is encountered during the <br /> fieldwork, Triple E Produce Facility will notify the appropriate utility agency. The fire <br /> department will be notified during an emergency. <br /> r <br /> A-7 NIL—* <br /> L� CONDOR <br />
The URL can be used to link to this page
Your browser does not support the video tag.