My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LINNE
>
8690
>
2900 - Site Mitigation Program
>
PR0009063
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2021 10:13:38 AM
Creation date
5/2/2019 1:24:23 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0009063
PE
2960
FACILITY_ID
FA0003785
FACILITY_NAME
PACIFIC TRIPLE E LTD
STREET_NUMBER
8690
Direction
W
STREET_NAME
LINNE
STREET_TYPE
RD
City
TRACY
Zip
95304
APN
253-210-180-00
CURRENT_STATUS
01
SITE_LOCATION
8690 W LINNE RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
253
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
% California Regional Water Quality Control Board <br /> 0 Central Valley Region x <br /> Steven T.Butler,Acting Chair <br /> Winston H.Hickox Gray Davis <br /> Secretaryfor Sacramento Main Office Governor <br /> Environmental Internet Address: http://www.swrcb.ca.gov/-rwgcb5 <br /> Protection 3443 Routier Road,Suite A,Sacramento,California 95827-3003 <br /> Pbone(916)255-3000•FAX(916)255-3015 <br /> 11 February 1999 <br /> Mr. Tom Guido <br /> Triple E Produce <br /> P. O. Box 239 <br /> Tracy, CA 95378 <br /> TECHNICAL REPORT,ALTERNATIVE METHODS FOR TREATMENT OF GROUNDWATER, <br /> TRIPLE E PROD UCE, TRACY, SAN JOAO UIN CO UNTY <br /> Thank you for submitting the 15 January 1999 report entitled Technical Report, Alternative Methods <br /> For Treatment of Groundwater for the Triple E Produce facility in Tracy. Your cover letter to the report <br /> discusses tasks that Triple E proposed in an April 1998 work plan which Board staff conditionally <br /> approved in August 1998. Your letter states that unless notified otherwise before 15 February, Triple E <br /> will conclude that those tasks are no longer needed. <br /> As we discussed in our 9 February 1999 telephone conversation, a new staff person, Joseph Mello, will <br /> begin work at the Board on 16 February and will be the new project manager for this site. He will <br /> review the case file and reports in the next few weeks, including the 15 January report referenced above. <br /> Until his review is completed, Triple E cannot conclude that any particular tasks are no longer needed. <br /> During our phone conversation, we agreed that it would be helpful to have a meeting as soon as Mr. <br /> Mello is up to speed on the project. We agreed on the week of 8 March, and I told you any day that <br /> week is good for me except the morning of 9 March and all day on 10 March. You said you would <br /> check with people on your end to determine what date is best for them. Please let me know when you <br /> have selected a date. <br /> I look forward to moving ahead with this project. If you have any questions,you may call me at(916) <br /> 255-3075. <br /> WENDYIL. COHEN <br /> Senior Engineer <br /> cc: Mr. Michael Infuma, San Joaquin County Environmental Health Division, Stockton <br /> Mr. Michael Campos, Washburn, Briscoe, and McCarthy, Sacramento <br /> Mr. John Kramer, Condor Earth Technology, Sonora <br /> California Environmental Protection Agency <br /> Ca Recvcled Paper <br />
The URL can be used to link to this page
Your browser does not support the video tag.