My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LINNE
>
8690
>
2900 - Site Mitigation Program
>
PR0009063
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2021 10:13:38 AM
Creation date
5/2/2019 1:24:23 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0009063
PE
2960
FACILITY_ID
FA0003785
FACILITY_NAME
PACIFIC TRIPLE E LTD
STREET_NUMBER
8690
Direction
W
STREET_NAME
LINNE
STREET_TYPE
RD
City
TRACY
Zip
95304
APN
253-210-180-00
CURRENT_STATUS
01
SITE_LOCATION
8690 W LINNE RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
253
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
U�� <br /> �� <br /> Triple E Produce <br /> P.O. BOX 239 TRACY,CA 95378-0239 PH. (209)835-5123 <br /> November 6, 1997 <br /> P.O. Box 388 <br /> Stockton, CA 95201 <br /> Attn: Mike Infurna <br /> RE: EVALUATION OF CHLOROFORM IN GROUNDWATER AND <br /> EFFECTIVENESS OF EXTRACTION,TRIPLE E PRODUCE, TRACY, CA, <br /> SAN JOAQUIN COUNTY <br /> In response to a letter from the Central California Reginal Water Quality Control Board dated <br /> July 18, 1997, we are submitting the above referenced report. This report evaluates the extent of <br /> chloroform in the groundwater north of our facility and the effectiveness of the groundwater <br /> extraction. It includes recommendations for continuing the monitoring, extraction, and treatment <br /> program which is achieving a reduction in the level of chloroform in the groundwater. <br /> The fourth quarter sampling will be done in December as scheduled. As required by our <br /> discharge requirements, a report will be submitted for this quarterly groundwater monitoring. <br /> Respectfully Submitted, <br /> TRIPLE7ze�; <br /> E <br /> Tom Guido <br /> cc: Mike Campos - Graham and James, Sacramento, CA <br /> Mike Infuma- San Joaquin County PHS-EHD <br /> Robert Dixon - Condor Earth Technologies, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.