My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LINNE
>
8690
>
2900 - Site Mitigation Program
>
PR0009063
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2021 10:13:38 AM
Creation date
5/2/2019 1:24:23 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0009063
PE
2960
FACILITY_ID
FA0003785
FACILITY_NAME
PACIFIC TRIPLE E LTD
STREET_NUMBER
8690
Direction
W
STREET_NAME
LINNE
STREET_TYPE
RD
City
TRACY
Zip
95304
APN
253-210-180-00
CURRENT_STATUS
01
SITE_LOCATION
8690 W LINNE RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
253
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
"Now .� <br /> TRIPLE E PRODUCE -4- <br /> GROUND WATER TREATMENT AND DISPOSAL <br /> SAN JOAQUIN COUNTY <br /> monitoring provides sufficient data. Background water quality determined in this manner <br /> establishes "water quality protection standards.") <br /> 2. Contain chemicals, heavy metals, or trace elements in concentrations that adversely affect <br /> beneficial uses or exceed maximum contaminant levels specified in 22 CCR,Division 4, <br /> Chapter 15. <br /> 3. Contain taste or odor-producing substances in concentrations that cause nuisance or <br /> adversely affect beneficial uses. <br /> 4. Contain concentrations of chemical constituents in amounts that adversely affect agricultural <br /> use. <br /> D. Provisions: <br /> 1. The Discharger shall comply with the Monitoring and Reporting Program No. _, which is <br /> part of this Order, and any revisions thereto as ordered by the Executive Officer. <br /> 2. The Discharger shall comply with the "Standard Provisions and Reporting Requirements for <br /> Waste Discharge Requirements", dated 1 March 1991, which are attached hereto and by <br /> reference a part of this Order. This attachment and its individual paragraphs are commonly <br /> referenced as "Standard Provision(s)." <br /> 3. In the event of any change in control or ownership of land or waste discharge facilities <br /> described herein, the Discharger shall notify the succeeding owner or operator of the <br /> existence of this Order by letter, a copy of which shall be immediately forwarded to this <br /> office. <br /> 4. At least 90 days prior to termination or expiration of any lease,contract, or agreement <br /> involving disposal or reclamation areas or off-site reuse of effluent, used to justify the <br /> capacity authorized herein and assure compliance with this Order, the Discharger shall notify <br /> the Board in writing of the situation and of what measures have been taken or are being taken <br /> to assure full compliance with this Order. <br /> 5. The Discharger must comply with all conditions of this Order, including timely submittal of <br /> technical and monitoring reports as directed by the Executive Officer. Violations may result <br /> in enforcement action,including Regional Board or court orders requiring corrective action or <br /> imposing civil monetary liability, or in revision or rescission of this Order. <br /> 6. The Discharger shall comply with the following time schedule to assure compliance with the <br /> above Disposal Area Ground Water Limitations: <br /> Compliance <br /> ilk Date Report Date <br /> Submit Ground Water Monitoring Plan 15 May 1996 <br /> Submit Monitoring Well Plans& Specifications 15 May 1996 <br /> Begin Monitoring Well Construction 1 July 1996 <br /> Collect First Round of Ground Water Samples 1 Sept. 1996 <br /> Submit Report of Ground Water Quality 1 Sept. 1997 <br /> Protection Standards for Each Disposal Area <br /> The Discharger shall submit to the Board on or before each compliance report date, a report <br /> detailing compliance or noncompliance with the specific schedule date and task. If <br /> noncompliance is being reported, the reasons for such noncompliance shall be stated, plus an <br />
The URL can be used to link to this page
Your browser does not support the video tag.