My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LINNE
>
8690
>
2900 - Site Mitigation Program
>
PR0009063
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2021 10:13:38 AM
Creation date
5/2/2019 1:24:23 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0009063
PE
2960
FACILITY_ID
FA0003785
FACILITY_NAME
PACIFIC TRIPLE E LTD
STREET_NUMBER
8690
Direction
W
STREET_NAME
LINNE
STREET_TYPE
RD
City
TRACY
Zip
95304
APN
253-210-180-00
CURRENT_STATUS
01
SITE_LOCATION
8690 W LINNE RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
253
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CALIFORNIA REGIONAL WATER QUALITY CONTROL BOARD <br /> CENTRAL VALLEY REGION <br /> MONITORING AND REPORTING PROGRAM NO. <br /> FOR <br /> TRIPLE E PRODUCE CORPORATION <br /> GROUND WATER TREATMENT AND DISPOSAL FACILITIES <br /> SAN JOAQUIN COUNTY <br /> Specific sample station locations shall be established under direction of the Board's staff and a <br /> description of the stations shall be attached to this Order. <br /> Prior to construction, plans and specifications for ground water monitoring wells shall be <br /> submitted to Board staff for review and approval. <br /> INFLUENT MONITORING <br /> Influent monitoring shall be performed at each of the extraction well(s) and shall include at least the <br /> following minimum monitoring: <br /> Constituents Units Type of Sample Frequency <br /> Flow gpd Cumulative weekly/monthlyl <br /> pH pH Units Grab weekly/monthlyl <br /> Specific Conductivity pmhos/cm Grab weekly/monthlyl <br /> Total Trihalomethanes µg/1 Grab weekly/monthlyl <br /> Total Dissolved Solids mg/l Grab weekly/monthly' <br /> Standard Minerals2 mg/l Grab quarterly3 <br /> l Weekly sampling to be performed the fust month of ground water extraction,then monthly thereafter. <br /> 2 Standard minerals shall include all major cations and anions and include a verification that the analysis is <br /> complete(i.e.,cation/anion balance). <br /> 3 The first quarterly sample shall be collected during the first month of extraction well(s)operation. <br /> EFFLUENT MONITORING <br /> Aeration/Percolation Pond Monitoring <br /> Aeration/percolation pond monitoring shall include effluent samples collected from the pond <br /> surface. Pond monitoring shall include at least the following: <br /> Constituents Units Type of Sample Freauencv_ <br /> Flow gpd Cumulative weekly/monthly' <br /> pH pH Units Grab weekly/monthly' <br /> Specific Conductivity µmhos/cm Grab weekly/monthly' <br /> Total Trihalomethanes 99/1 Grab weekly/monthly' <br /> Total Dissolved Solids mg/1 Grab weekly/monthly' <br /> Standard MineralS2 mg/l Grab quarterly3 <br /> 1 Weekly sampling to be performed the first month ground water is pumped to the Apricot orchard spray <br /> field,with the first weekly sample collected within the first two days after start-up,then monthly thereafter. <br /> 2 Standard minerals shall include all major cations and anions and include a verification that the analysis is <br /> complete(i.e.,cation/anion balance). <br /> 3 The fust quarterly sample shall be collected during the first month of extraction well(s)operation. <br />
The URL can be used to link to this page
Your browser does not support the video tag.