My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LINNE
>
8690
>
2900 - Site Mitigation Program
>
PR0009063
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2021 10:13:38 AM
Creation date
5/2/2019 1:24:23 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0009063
PE
2960
FACILITY_ID
FA0003785
FACILITY_NAME
PACIFIC TRIPLE E LTD
STREET_NUMBER
8690
Direction
W
STREET_NAME
LINNE
STREET_TYPE
RD
City
TRACY
Zip
95304
APN
253-210-180-00
CURRENT_STATUS
01
SITE_LOCATION
8690 W LINNE RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
253
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Vit�i_ NL,�I.1 it <br /> VIff <br /> U-N <br /> Triple E Produce _ OO MAY 22 PM 12: 58 <br /> P O BOX 239 TRACY, CA 95378-0239 PR(209)835-5123 <br /> May 18, 2000 <br /> California Regional Water Quality Control Board <br /> Central Valley Region <br /> 3433 Routier Rd, Suite A <br /> Sacramento, CA 95827-3098 <br /> Attn: Mr. Joe Mello <br /> RE: Triple a Groundwater Redemption System Shut Down <br /> Dear Mr. Mello: <br /> In accordance with your letter dated May 8, 2000, Triple E has <br /> stopped pumping groundwater from extraction wells MW-4A and <br /> XW- 1 as of May 17, 2000. Quarterly groundwater monitoring will <br /> be scheduled for May 30 and 31 , within two weeks of the shut <br /> down. Third and fourth quarter sampling will continue as <br /> scheduled, with the fourth quarter sampling occurring within 180 <br /> days of June 1 . During the shutdown Triple E expects the aeration <br /> pond will dry out. <br /> Sincerel � <br /> _roc-;► � -lam <br /> Tom Guido, Triple E Produce <br /> Field Manager <br /> Cc: Michael Campos, Washburn, Briscoe & McCarthy <br /> Bob Dixon, Condor Earth Technologies, Inc. <br /> John Kramer, Condor Earth Technologies, Inc. <br /> Mike Infurna, San Joaquin County PI-ID-EHD <br />
The URL can be used to link to this page
Your browser does not support the video tag.