Laserfiche WebLink
Mr.Joe Mello <br /> March 15, 1999 <br /> Page 3 <br /> in the NOV. Since no new unpermitted functions will be initiated, no work plan will be <br /> submitted to the Regional Board for approval. <br /> Reporting <br /> Monitoring reports will be submitted according to the schedule in the existing WDR 96-118. It <br /> will be assumed by Triple E Produce that the groundwater monitoring requirements of WDR 90- <br /> 142 duplicated in WDR 96-118 is satisfied by these reports. In addition, Triple E Produce will <br /> provide an evaluation of the effectiveness of this alternative treatment method with <br /> recommendations for additional necessary changes in the 1999 Fourth Quarter Groundwater <br /> Monitoring Report. <br /> If you have any questions regarding technical details of this amendment, please give me a call. <br /> Please address your written correspondence, including approval to Mr. Tom Guido, Triple E <br /> Produce, P.O. Box 239, Tracy, CA 95378. <br /> Respectfully submitted, <br /> CONDOR EARTH TECHNOLOGIES, INC. <br /> ohn H. Kramer <br /> Sr. Hydrogeologist <br /> cc: Tom Guido, Triple E Produce <br /> Bob Dixon, Condor Earth Technologies, Inc. <br /> Michael Campos, Washburn, Briscoe & McCarthy <br /> F:\PR0JEC'R0809\C0R\melloMarch 9.doc <br /> N• <br /> t, CONDOR <br />