My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MADISON
>
423
>
3500 - Local Oversight Program
>
PR0544428
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2019 5:07:16 PM
Creation date
5/6/2019 4:58:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0544428
PE
3528
FACILITY_ID
FA0004581
FACILITY_NAME
CHASE CHEVROLET*
STREET_NUMBER
423
Direction
N
STREET_NAME
MADISON
STREET_TYPE
ST
City
STOCKTON
Zip
95203
CURRENT_STATUS
02
SITE_LOCATION
423 N MADISON ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
{ <br /> Underground Service Alert(IDSA) will be notified to mark buried utilities in the vicinity of the <br /> lu <br /> proposed drilling locations; and <br /> A private utility locator will be retained to screen for buried utilities in the vicinity of the proposed <br /> drilling locations. <br /> Borings for the wells will be drilled using auger or direct push methods. The borings will be drilled to a <br /> depth of either 30 feet (for shallow wells) and 55 feet(for deep wells). However exact depths will <br /> depend on field observed groundwater levels and soil types encountered. During drilling, soil samples <br /> will be collected at minimum intervals of approximately 5 feet or detectable changes in lithology <br /> (whichever is more frequent). Soil samples will be classified in the field in approximate accordance with <br /> ASTM Standard 2488 - Standard Practice for Description and Identification of Soils(Visual-Manual <br /> Procedure). Samples will be screened in the field using an organic vapor meter. <br /> Samples with indications of contamination will be retained for laboratory analysis. At a minimum, one soil <br /> i sample collected at the groundwater table from each boring will be retained for laboratory analysis. Soil <br /> samples will be analyzed for TPH-g and BTEX and MTBE by EPA Method 8015M/8021. The monitoring <br /> wells will be completed as 2-inch schedule 40 PVC wells. Surging, bailing, and pumping will be employed <br /> to develop the wells. Well elevations (top of casing)will be surveyed relative to the existing onsite <br /> datum. <br /> Drilling, soil sampling, grab groundwater sampling, well Installation, and well development will be <br /> performed in accordance with the attached standard operating procedures (Appendix A). <br /> 4.2 Groundwater Monitoring <br /> Groundwater monitoring will be conducted in accordance with SJCEHD guidelines and the SOP for <br /> groundwater sampling in Appendix A. Samples will be sent to a state-certified laboratory for analysis <br /> using chain-of-custody protocols. Prior to purging, water levels will be measured for the purposes of <br /> constructing groundwater gradient diagrams. Groundwater samples will be analyzed for TPHg, BTEX, <br /> MTBE and fuel oxygenates(EPA Method 8260). <br /> �d <br /> 5 <br /> 25971030.DGD 9 October 2009 <br /> t <br />
The URL can be used to link to this page
Your browser does not support the video tag.