My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
V
>
VICTOR
>
930
>
2900 - Site Mitigation Program
>
PR0505363
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2019 4:30:32 PM
Creation date
5/7/2019 3:59:24 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0505363
PE
2960
FACILITY_ID
FA0005584
FACILITY_NAME
VALLEY PACIFIC LODI PLANT & CARDLOCK
STREET_NUMBER
930
Direction
E
STREET_NAME
VICTOR
STREET_TYPE
RD
City
LODI
Zip
95240
APN
04905023
CURRENT_STATUS
01
SITE_LOCATION
930 E VICTOR RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
AMeuangkhoth
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
374
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Nathan Crum - 2 - 1 February 2006 <br />Valley Pacific Petroleum Services, Inc. <br />The Central Valley Regional Board concurs with the recommendation to more aggressively remove SPH <br />accumulating in well MW8. GZA issued a 29 April 2005 letter recommending installation of a product <br />skimmer in well MW8 if SPH again began accumulating in the well. Valley Pacific should provide a <br />written response to this letter of their plan to install the product skimmer or other means to more <br />efficiently collect SPH from the well and an associated implementation schedule by 24 February 2006. <br />The response should also include a site plan showing the location of soil boring SBA installed in <br />October 2005 as the location was not shown on site plans submitted in the Second Semi -Annual Report <br />or the Annual Report. <br />The next semi-annual monitoring report is due by 1 August 2006. As of October 2005, I have become the <br />project manager for this site. If you have any questions regarding this letter, you may contact me at (916) <br />464-4719 or mclardy@waterboards.ca.gov. <br />�?z <br />V (YAL <br />MARK W. CLARDY,.G. <br />Engineering Geologist <br />cc: Mr. Gregory Stahl, Ground Zero Analysis, Inc., Escalon <br />Mr. Patrick Riddle, Law Offices of Patrick D. Riddle, Acampo <br />Mr. John Miller, Valley Pacific Petroleum Services, Inc., Stockton <br />Mr. Harlin Knoll, San Joaquin County Environmental Health Department, Stockton <br />
The URL can be used to link to this page
Your browser does not support the video tag.